flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Technical brief addresses the impact of construction-generated moisture on commercial roofing systems

Codes and Standards

Technical brief addresses the impact of construction-generated moisture on commercial roofing systems

The free download offers suggestions for remediation actions.


By Peter Fabris, Contributing Editor | March 15, 2024
Photo by Nicholas Ismael Martinez on Unsplash

Photo by Nicholas Ismael Martinez on Unsplash

A new technical brief from SPRI, the trade association representing the manufacturers of single-ply roofing systems and related component materials, addresses construction-generated moisture and its impact on commercial roofing systems.

Construction-generated moisture comes from activities including pouring concrete, burning propane heaters, painting, plastering, and drywall finishing. These activities can contribute to excessive levels of relative humidity inside the structure when proper remediation measures are not taken. Accumulation of condensation within the roofing assembly and within the structure can result when the temperature is at or below the dew point.

To control moisture, designers must identify the sources of moisture and develop a remediation plan during the design process. To reduce the probability of condensation, buildings under construction must be adequately ventilated, particularly during concrete hydration and other high moisture-related construction activities.

SPRI recommendations include avoiding the use of wet materials or materials with excessive moisture, installing vapor retarders in the roof assembly, avoiding penetrating vapor barriers, installing at least two layers of insulation, and always sealing deck-to-wall joints and gaps around roof penetrations.

Related Stories

| Oct 8, 2013

ConsensusDocs offers online prequalification management application to boost industry efficiency

In collaboration with ConsensusDocs, iSqFt has launched a new online platform designed to make the prequalification process for contractors and subcontractors seeking new work more efficient.

| Oct 8, 2013

Government shutdown closes E-Verify, could hamper construction hiring

E-Verify, the online federal program used to check the immigration status of prospective hires, has been closed due to the federal government shutdown.

| Oct 3, 2013

Florida contractors worry that regulations will hamper their ability to hire

Regulations such as the E-Verify rule and the Affordable Care Act could hinder contractors from hiring additional workers, according to some Florida contractors.

| Oct 3, 2013

Fall protection violations top OSHA citations list

Violations of fall-protection standards in fiscal 2013 are again the most frequent source of citations from the Occupational Safety and Health Administration, according to its top 10 list.

| Oct 3, 2013

Arizona utility pushes for change in building codes to boost efficiency on all commercial projects

Many large construction projects in Arizona are going green by paying attention to energy efficiency, but smaller buildings that are often rented out haven't yet jumped on the bandwagon.

| Oct 3, 2013

Bipartisan energy efficiency bill stalled; may not be revived this year

The Senate spent the first two weeks of September trying to pass bipartisan energy efficiency legislation, commonly known as Shaheen-Portman (S. 1392) that would have impacted building codes.

| Oct 3, 2013

LEED credential exams will feature LEED v4 material beginning next spring

The LEED Professional Credential exams for the LEED Green Associate and LEED AP with specialty designations will feature LEED v4 material beginning in late spring 2014.

| Sep 26, 2013

Ballot period on National CAD Standards open until Oct. 13

The Ballot Comment Period to update the nation’s leading computer-aided design (CAD) standard is now open.

| Sep 26, 2013

OSHA encourages comments on respirable crystalline silica rules

The Occupational Safety and Health Administration’s proposed rulemaking for respirable crystalline silica has been published in the Federal Register.

| Sep 26, 2013

EPA’s final rule on updated ASTM standard likely to be withdrawn

The Environmental Protection Agency is expected to withdraw a direct final ruleissued in Augustregarding an ASTM standard for Phase I Environmental Site.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021