flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Technical brief addresses the impact of construction-generated moisture on commercial roofing systems

Codes and Standards

Technical brief addresses the impact of construction-generated moisture on commercial roofing systems

The free download offers suggestions for remediation actions.


By Peter Fabris, Contributing Editor | March 15, 2024
Photo by Nicholas Ismael Martinez on Unsplash

Photo by Nicholas Ismael Martinez on Unsplash

A new technical brief from SPRI, the trade association representing the manufacturers of single-ply roofing systems and related component materials, addresses construction-generated moisture and its impact on commercial roofing systems.

Construction-generated moisture comes from activities including pouring concrete, burning propane heaters, painting, plastering, and drywall finishing. These activities can contribute to excessive levels of relative humidity inside the structure when proper remediation measures are not taken. Accumulation of condensation within the roofing assembly and within the structure can result when the temperature is at or below the dew point.

To control moisture, designers must identify the sources of moisture and develop a remediation plan during the design process. To reduce the probability of condensation, buildings under construction must be adequately ventilated, particularly during concrete hydration and other high moisture-related construction activities.

SPRI recommendations include avoiding the use of wet materials or materials with excessive moisture, installing vapor retarders in the roof assembly, avoiding penetrating vapor barriers, installing at least two layers of insulation, and always sealing deck-to-wall joints and gaps around roof penetrations.

Related Stories

Codes and Standards | Jan 31, 2018

California is the first state to phase out incandescent light bulbs

In two years, the rest of the U.S. will follow suit.

Codes and Standards | Jan 31, 2018

Automated tool assists in design of force transfer around openings

Engineered Wood Assn. offers free calculator and technical note.

Codes and Standards | Jan 31, 2018

First large-scale use of perovskite solar cells in office building slated for Poland this year

Skanska will integrate the technology into building facades.

Codes and Standards | Jan 29, 2018

Advanced Energy Design Guide for K-12 Schools to achieve zero energy

Publication is joint effort by ASHRAE, AIA, IES, and USGBC.

Codes and Standards | Jan 26, 2018

Flying drones while inebriated now illegal in New Jersey

Violators could be sentenced to six months in jail.

Codes and Standards | Jan 25, 2018

OSHA penalties for violations increase

Fines adjusted for inflation in the New Year.

Codes and Standards | Jan 23, 2018

Disaster mitigation strategies that exceed code could save billions

Four dollars saved for every dollar spent, says NIBS report.

Codes and Standards | Jan 19, 2018

U.S. construction fatalities rose 6% in 2016

Falls accounted for 39% of deadly accidents.

Codes and Standards | Jan 18, 2018

Record storm surge in Boston prompts renewed calls for flood mitigation infrastructure

Newer buildings constructed in flood zone fared well.

Codes and Standards | Jan 17, 2018

Green Building Initiative acquires global rights to Green Globes from JLL

Transaction allows GBI to expand operations to Canada and elsewhere.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021