The Tilt-Up Concrete Association (TCA) – a non-profit international organization that serves to expand and improve the use of Tilt-Up as the preferred construction method -- has announced the release of The Construction of Tilt-Up.
The newest publication from the TCA is the second in a planned trilogy of resources covering the architecture, engineering and construction of Tilt-Up. The Construction of Tilt-Up presents state-of-the-art information and large colorful imagery of the construction process. Continuing the high quality evidenced in The Architecture of Tilt-Up, this book also uses the new large format (10 inches by 10 inches).
“The Construction of Tilt-Up is a long overdue publication,” states Jim Baty, TCA Technical Director. “Recognizing the impact that Hugh Brooks has had on the industry when he produced the Tilt-Up Design and Construction Manual, there has been a wealth of technology and process change in the last decade. The focus of our effort on this manual was to bring to light these technological improvements and testimonies to the maturity of the professional contractors in the industry. It is a great companion to The Architecture of Tilt-Up that was released last year.”
Topics covered in the book include: planning; slabs and foundation; panel layout and forming; reinforcement; inserts and embedded items; placing and finishing of the panels; lifting, setting and bracing of the panels; connections; and finishing touches.
The Construction of Tilt-Up is available for $145 for non-members or $95 for members. For orders of 10 or more, each book is available at a reduced rate of $75. For questions or to order, contact TCA at 319-895-6911, info@tilt-up.org or purchase online from the TCA website at www.tilt-up.org/resources. The book will also be available for purchase at the TCA’s booth at this year’s World of Concrete in Las Vegas, Nevada in January. BD+C
Related Stories
| Jan 21, 2015
Tesla Motors starts construction on $5 billion battery plant in Nevada
Tesla Motors’ “gigafactory,” a $5 billion project on 980 acres in Sparks, Nev., could annually produce enough power for 500,000 electric cars.
| Jan 20, 2015
Daring hotel design scheme takes the shape of cut amethyst stone
The Dutch practice NL Architects designed a proposal for a chain of hotels shaped like a rock cut in half to reveal a gemstone inside.
| Jan 20, 2015
Avery Associates unveils plans for London's second-tallest tower
The 270-meter tower, dubbed the No. 1 Undershaft, will stand next to the city's "Cheesegrater" building.
| Jan 20, 2015
AIA course: Building with brick, stone, and masonry
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Jan 19, 2015
HAO unveils designs for a 3D movie museum in China
New York-based HAO has released designs for the proposed Bolong 3D Movie Museum & Mediatek in Tianjin.
| Jan 19, 2015
Gaudi’s first work outside Spain will be a chapel in Chile
Nearly 100 years after Antoni Gaudí’s death, Chile will begin constructing a chapel using his designs.
| Jan 19, 2015
Architecture for Humanity closes office, plans to file for bankruptcy
After more than 15 years of work, the nonprofit design group Architecture for Humanity has closed its San Francisco office and plans to file for Chapter 7 bankruptcy protection.
| Jan 19, 2015
Four Seasons tower will be Boston's tallest
On Jan. 14, 2015, developer Carpenter & Company and executives from the Four Seasons broke ground on the Four Seasons Hotel & Private Residences, which will become the tallest building in Boston at 699 feet.
| Jan 19, 2015
Mystery buyer pays highest ever price for NYC residence
The 89th and 90th floors of 157 W. 57th Street have just been purchased for more than $100 million.
| Jan 17, 2015
When is a train station not a train station? When it’s a performance venue
You can catch a train at Minneapolis’s new Target Field Station. You can also share in an experience. That’s what ‘Open Transit’ is all about.