The Tilt-Up Concrete Association (TCA) – a non-profit international organization that serves to expand and improve the use of Tilt-Up as the preferred construction method -- has announced the release of The Construction of Tilt-Up.
The newest publication from the TCA is the second in a planned trilogy of resources covering the architecture, engineering and construction of Tilt-Up. The Construction of Tilt-Up presents state-of-the-art information and large colorful imagery of the construction process. Continuing the high quality evidenced in The Architecture of Tilt-Up, this book also uses the new large format (10 inches by 10 inches).
“The Construction of Tilt-Up is a long overdue publication,” states Jim Baty, TCA Technical Director. “Recognizing the impact that Hugh Brooks has had on the industry when he produced the Tilt-Up Design and Construction Manual, there has been a wealth of technology and process change in the last decade. The focus of our effort on this manual was to bring to light these technological improvements and testimonies to the maturity of the professional contractors in the industry. It is a great companion to The Architecture of Tilt-Up that was released last year.”
Topics covered in the book include: planning; slabs and foundation; panel layout and forming; reinforcement; inserts and embedded items; placing and finishing of the panels; lifting, setting and bracing of the panels; connections; and finishing touches.
The Construction of Tilt-Up is available for $145 for non-members or $95 for members. For orders of 10 or more, each book is available at a reduced rate of $75. For questions or to order, contact TCA at 319-895-6911, info@tilt-up.org or purchase online from the TCA website at www.tilt-up.org/resources. The book will also be available for purchase at the TCA’s booth at this year’s World of Concrete in Las Vegas, Nevada in January. BD+C
Related Stories
Building Team Awards | Apr 9, 2015
Multifaced fitness center becomes campus landmark
A sloped running track and open-concept design put this Building Team to the test.
Building Team Awards | Apr 9, 2015
Nation's first LEED-certified bus depot
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.
Building Team Awards | Apr 9, 2015
Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.
Cultural Facilities | Apr 7, 2015
Mies’ Martin Luther King Jr. Library to get makeover
The architects say the modernization aims to improve “Mies in a contemporary Miesian way.”
Cultural Facilities | Apr 6, 2015
Berkeley’s West Branch Library generates more energy than it uses
The 9,400-sf facility is California's first Net Zero Energy-certified building.