Tampa International Airport is about to see a major facelift come Dec. 2, according to The Tampa Tribune. The airport’s first floor of the terminal on the east end of baggage claim will be the first location to have work done. Directing traffic will be the airport’s main duty once construction is underway, with volunteers, signs and newly hired customer personnel guiding passengers as they exit planes.
The east end of the ground transportation floor will become the station for the airport’s people mover, a new addition to the building that features a light-rail train that shuttles passengers between the airport, the economy lot and the rental car facility. This renovation is expected to take three years.
The airport’s transfer level will see changes beginning in January. Shuttle walkways will be pushed back to create 50,000-sf of extra space on the third floor, which will accommodate more concessions. While there is no word yet on what new concessions will be added, travelers will begin to see new shops and restaurants opening in 2016.
The first phase of the plan will cost $1 billion and happen over a period of three years. It is expected to give thousands of people jobs while decongesting area roadways, allowing rental car companies to grow, and preparing the airport for a doubling of passengers by 2041. The project will also keep the airport running efficiently and effectively for the next 20-30 years.
For more information abut the project, visit www.tampaairport.com.
Related Stories
| Aug 11, 2010
First CityCenter projects earn LEED Gold
CityCenter announced today that it has received three Leadership in Energy and Environmental Design LEED Gold certifications from the U.S. Green Building Council for: 1) ARIA Resort's hotel tower; 2) ARIA Resort's convention center and theater; 3) Vdara Hotel. ARIA and Vdara will open in December on the Las Vegas Strip and are the first of CityCenter's developments to be LEED certified.
| Aug 11, 2010
SMPS announces 2009-2010 national board of directors
The Society for Marketing Professional Services (SMPS) has announced its 2009–2010 National Board of Directors, composed of senior marketing and business development leaders representing the architectural, engineering/planning, and construction industry.
| Aug 11, 2010
AIA to Congress: Act now to jump start building sector of economy
Tampa-based architect, Mickey Jacob, FAIA, unveiled the American Institute of Architects’ (AIA) Rebuild & Renew plan for both short- and long-term economic recovery to the House Committee on Small Business at a hearing October 7th.
| Aug 11, 2010
Oldcastle Precast Building Systems wins PCI 2009 Sustainable Design Award
Oldcastle Precast Building Systems was part of the award winning team behind the affordable housing development Melrose Commons Site 5 situated in the South Bronx. PCI (Precast Concrete Institute) recently selected Melrose 5 for the “2009 PCI Design Award for Best Sustainable Project”.
| Aug 11, 2010
AAMA developing product-based green certification program for fenestration
The American Architectural Manufacturers Association is working on a product-based green certification program for residential and commercial fenestration, the organization announced today. AAMA will use the results of a recent green building survey to help shape the program. Among the survey's findings: 77% of respondents reported a green certification program for fenestration would benefit the product selection process for their company.
| Aug 11, 2010
Peter Marchetto joins Tishman as president of Construction Operations
Tishman Construction Corporation Chairman, Daniel R. Tishman, today announced that Peter Marchetto joined the company as President of Construction Operations.
| Aug 11, 2010
Jacobs, HDR top BD+C's ranking of the nation's 100 largest institutional building design firms
A ranking of the Top 100 Institutional Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants