flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Taller timber buildings approved in National Fire Protection Association code

Codes and Standards

Taller timber buildings approved in National Fire Protection Association code

Ensures compatibility with the International Building Code.


By Peter Fabris, Contirbuting Editor | September 15, 2020

Courtesy Pixabay

The new National Fire Protection Association (NFPA) 5000 Building Construction and Safety Code and NFPA 101 Life Safety Code have Allowances for larger and taller mass timber buildings.

“The addition of tall mass timber provisions to NFPA 5000 and NFPA 101 ensures compatibility with the International Building Code, thereby furthering the market opportunity for tall mass timber buildings,” said American Wood Council (AWC) Vice President of Codes & Regulations Kenneth Bland, P.E., in a news release. “NFPA’s recognition of tall mass timber furthers the availability of a low-embodied carbon alternative compared to traditional building materials.”

The new code is the result of a three-year process to review mass timber. Several NFPA Technical Committees with responsibility for building construction provisions developed new tall mass timber provisions.

The new provisions are intended to eliminate conflicts that can occur when compliance with both the IBC and NFPA 101 is required. The updated NFPA codes are expected to be available later this year.

Related Stories

| Sep 22, 2022

Gainesville, Fla., ordinance requires Home Energy Score during rental inspections

The city of Gainesville, Florida was recently recognized by the U.S. Dept. of Energy for an adopted ordinance that requires rental housing to receive a Home Energy Score during rental inspections.

| Sep 19, 2022

New York City construction site inspections, enforcement found ‘inadequate’

A new report by the New York State Comptroller found that New York City construction site inspections and regulation enforcement need improvement.

| Sep 16, 2022

Fairfax County, Va., considers impactful code change to reduce flood risk

Fairfax County, Va., in the Washington, D.C., metro region is considering a major code change to reduce the risk from floods.

| Sep 13, 2022

California building codes now allow high-rise mass-timber buildings

California recently enacted new building codes that allow for high-rise mass-timber buildings to be constructed in the state.

| Sep 8, 2022

U.S. construction costs expected to rise 14% year over year by close of 2022

Coldwell Banker Richard Ellis (CBRE) is forecasting a 14.1% year-on-year increase in U.S. construction costs by the close of 2022.

| Aug 29, 2022

Montana becomes first U.S. state to approve 3D printing in construction

Montana is the first U.S. state to give broad regulatory approval for 3D printing in building construction.

| Aug 25, 2022

New York City’s congestion pricing aims to reduce traffic, cut carbon

Officials recently released an environmental assessment that analyzes seven different possible pricing schemes for New York City’s congestion pricing program.

| Aug 23, 2022

New Mass. climate and energy law allows local bans on fossil fuel-powered appliances

A sweeping Massachusetts climate and energy bill recently signed into law by Republican governor Charlie Baker allows local bans on fossil fuel-powered appliances.

| Aug 22, 2022

Gainesville, Fla., lawmakers moved to end single-family zoning

The Gainesville City Commission recently voted to advance zoning changes that would allow duplexes, triplexes, and quadplexes to be built on land currently zoned for single-family homes.

| Aug 16, 2022

DOE funds 18 projects developing tech to enable buildings to store carbon

The Department of Energy announced $39 million in awards for 18 projects that are developing technologies to transform buildings into net carbon storage structures.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021