flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tall mass timber code changes receive final approval

Codes and Standards

Tall mass timber code changes receive final approval

New provisions to be included in the 2021 International Building Code.


By Peter Fabris, Contributing Editor | January 3, 2019
Wood planks

Courtesy Pixabay

The International Code Council (ICC) has approved all 14 of the tall mass timber code change proposals.

The proposals create three new types of construction (Types IV-A, IV-B and IV-C), which set fire safety requirements, and allowable heights, areas, and number of stories for tall mass timber buildings. The new provisions will be included in the 2021 International Building Code (IBC).

The three new types of construction that will be included in the 2021 IBC are:

· Type IV-A – Maximum 18 stories, with gypsum wallboard on all mass timber elements.

· Type IV-B – Maximum 12 stories, limited-area of exposed mass timber walls and ceilings allowed.

· Type IV-C – Maximum 9 stories, all exposed mass timber designed for a 2-hour fire resistance.

“The addition of tall mass timber to the International Building Code provides a comprehensive set of safety standards for these new types of construction,” said American Wood Council Vice President of Codes & Regulations Kenneth Bland, P.E., in a news release. “This vote caps off several years of scientific research and testing, and verifies that mass timber meets the robust performance standards called for by our nation’s building codes.”

Related Stories

| Sep 11, 2013

White paper examines Joint Commission requirements for NFPA codes in healthcare

The healthcare industry has experienced great attention from The Joint Commission concerning fire and life safety issues.

| Sep 11, 2013

San Francisco expected to drop firefighter air tank refilling station rule for skyscrapers

San Francisco is poised to drop a requirement that skyscrapers have refill stations so firefighters can recharge their air tanks during a blaze. The city has required that new high-rises have the air refill systems for about ten years. 

| Sep 5, 2013

State legislatures continue to raise the bar on green school construction

Since the beginning of 2013, the USGBC has followed more than 125 bills across 34 states that seek to advance healthy, high-performing schools.

| Sep 5, 2013

Construction industry groups create coalition to respond to new OSHA silica rule

A group of 11 construction trade associations has created the Construction Industry Safety Coalition in response to the Occupational Safety and Health Administration’s (OSHA) proposed rule on silica for the construction industry.

| Sep 5, 2013

Red tape delays California county jail construction projects

California authorized $1.2 billion for jail construction in 2007, but not a single county in the state has completed a jail project since then.

| Sep 5, 2013

New CM-at-risk and design-build options create controversy in Ohio

Some contractors say Ohio's new system puts small and midsize construction companies at a disadvantage.

| Sep 5, 2013

Outdated codes slowed disaster recovery in Tuscaloosa, Ala.

Outdated building codes and lack of a master plan slowed the initial rebuilding stage after a devastating tornado leveled parts of Tuscaloosa, Ala. in 2011, according to the city’s mayor.

| Aug 28, 2013

Building collapse prompts legislation to beef up demolition regulations in Philadelphia

Philadelphia City Council will introduce legislation next month to strengthen the regulation of building demolition practices.

| Aug 28, 2013

Rules requiring contractors to boost hiring of veterans criticized

Some businesses are pushing back against proposed rules requiring federal contractors to step up their hiring of returning military service personnel.

| Aug 28, 2013

OSHA moves to reduced exposure to crystalline silica

Under a proposal from the Occupational Safety and Health Administration, the new permissible exposure limit to crystalline silica per cubic meter of air could be changed from 250 micrograms to 50 micrograms.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021