flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tall mass timber code changes receive final approval

Codes and Standards

Tall mass timber code changes receive final approval

New provisions to be included in the 2021 International Building Code.


By Peter Fabris, Contributing Editor | January 3, 2019
Wood planks

Courtesy Pixabay

The International Code Council (ICC) has approved all 14 of the tall mass timber code change proposals.

The proposals create three new types of construction (Types IV-A, IV-B and IV-C), which set fire safety requirements, and allowable heights, areas, and number of stories for tall mass timber buildings. The new provisions will be included in the 2021 International Building Code (IBC).

The three new types of construction that will be included in the 2021 IBC are:

· Type IV-A – Maximum 18 stories, with gypsum wallboard on all mass timber elements.

· Type IV-B – Maximum 12 stories, limited-area of exposed mass timber walls and ceilings allowed.

· Type IV-C – Maximum 9 stories, all exposed mass timber designed for a 2-hour fire resistance.

“The addition of tall mass timber to the International Building Code provides a comprehensive set of safety standards for these new types of construction,” said American Wood Council Vice President of Codes & Regulations Kenneth Bland, P.E., in a news release. “This vote caps off several years of scientific research and testing, and verifies that mass timber meets the robust performance standards called for by our nation’s building codes.”

Related Stories

Codes and Standards | Nov 14, 2017

California bill would require purchase of low-carbon construction products

Contractors would have to source products based on greenhouse gas impact, not price, on state projects.

Codes and Standards | Nov 13, 2017

New AIA contract document for facility support services released

Updated form intended to be used with owner-architect agreements.

Codes and Standards | Nov 9, 2017

NIBS, NBI issue guidance document to help communities achieve energy goals

Outcome-based codes compliance path looks at building’s actual performance.

Codes and Standards | Nov 7, 2017

Underwriters Laboratories launches wellness certification

First certification program that verifies products’ compliance with the WELL Building Standard.

Codes and Standards | Nov 6, 2017

Registration now open for Canada’s first Zero Carbon Building (ZCB) program

Standard is designed to be applicable across many types of new and existing buildings.

Codes and Standards | Nov 6, 2017

AIA releases new architect commissioning document

It will be used with the standard form for owner/consultant contracts.

Codes and Standards | Nov 2, 2017

ASHRAE releases new version of Thermal Comfort Standard

Update includes calculations from direct solar radiation.

Codes and Standards | Nov 1, 2017

Drone users can now get instant authorization from FAA

Skyward offers app to receive permission for low altitude flights.

Codes and Standards | Oct 31, 2017

Real estate giant launches global tenant health and wellness certification initiative

Tishman Speyer will use Fitwel health certification system to guide building improvements.

Codes and Standards | Oct 30, 2017

AIA revises architect scope documents in latest contract form release

Design-bid-build forms last updated in 2007.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021