flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Tall mass timber code changes receive final approval

Codes and Standards

Tall mass timber code changes receive final approval

New provisions to be included in the 2021 International Building Code.


By Peter Fabris, Contributing Editor | January 3, 2019
Wood planks

Courtesy Pixabay

The International Code Council (ICC) has approved all 14 of the tall mass timber code change proposals.

The proposals create three new types of construction (Types IV-A, IV-B and IV-C), which set fire safety requirements, and allowable heights, areas, and number of stories for tall mass timber buildings. The new provisions will be included in the 2021 International Building Code (IBC).

The three new types of construction that will be included in the 2021 IBC are:

· Type IV-A – Maximum 18 stories, with gypsum wallboard on all mass timber elements.

· Type IV-B – Maximum 12 stories, limited-area of exposed mass timber walls and ceilings allowed.

· Type IV-C – Maximum 9 stories, all exposed mass timber designed for a 2-hour fire resistance.

“The addition of tall mass timber to the International Building Code provides a comprehensive set of safety standards for these new types of construction,” said American Wood Council Vice President of Codes & Regulations Kenneth Bland, P.E., in a news release. “This vote caps off several years of scientific research and testing, and verifies that mass timber meets the robust performance standards called for by our nation’s building codes.”

Related Stories

Codes and Standards | Feb 21, 2018

FEMA document provides simplified seismic design provisions for low-hazard regions

Forty four states have areas defined as low-hazard.

Codes and Standards | Feb 20, 2018

Federal budget includes disaster mitigation provisions

Bipartisan bill encourages states to adopt latest building codes.

Codes and Standards | Feb 19, 2018

Easy access to indoor environment controls yields improved efficiency and workplace productivity

JLL/Purdue University project is developing algorithms to improve indoor comfort.

Codes and Standards | Feb 14, 2018

After Energy Star stopped certifying medical properties, a REIT developed its own certification

Welltower uses internal system to evaluate total building performance.

Codes and Standards | Feb 13, 2018

Rezoning, innovative investor enabling development of a “metroburb” in New Jersey

Indoor mixed-use “Main Street” blossoms in giant former Bell Labs building.

Codes and Standards | Feb 12, 2018

Publication provides insight into managing risk of wind-borne debris damage

Explains how models and data are used to assess the risk of structural damage.

Codes and Standards | Feb 8, 2018

EPA’s Water of the U.S. rule delayed for two years while repeal sought

Controversial Obama-era regulation may never be implemented.

Codes and Standards | Feb 5, 2018

Astrophysicist turns his skills toward identifying and predicting location of vacant buildings

Project could help Baltimore and other cities redevelop blighted properties.

Codes and Standards | Feb 5, 2018

Denver’s new green roof mandate raises implementation policies

Voter initiative left many details undecided.

Codes and Standards | Feb 2, 2018

How workplace design can position financial services companies for success

HOK report examines forces reshaping industry.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021