flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Taking ‘PIM’ Beyond E-mail

Taking ‘PIM’ Beyond E-mail

Newforma enhances its Project Center information management platform with a Revit add-in’ and mobile capability.


By By Jeff Yoders, Contributing Editor | March 10, 2011
This article first appeared in the March 2011 issue of BD+C.

With smart phones, iPads, electronic submittals and RFIs making their way to more construction sites and thoroughly permeating the design industry, project information management has become just as important as 3D design and the software tools that enable it. In the span of less than five years, Manchester, N.H.-based Newforma has grown from a small company to an industry leader in the PIM category, with 42,000 licensed users of its Newforma Project Center software. To date more than 500,000 terabytes of project data, 100 million e-mails, three million transmittals, and 500,000 submittals have been managed using Newforma Project Center.

Newforma is moving beyond its core e-mail, search, and information-sharing capabilities with the eighth edition of its Newforma Project Center. It will also soon offer three new “add-in” products: Newforma Mobile for on-the-go access to project information via any smart phone; Newforma Add-in for Autodesk Revit, which takes advantage of the more open Autodesk Revit API to connect the Revit building model to information managed in Newforma Project Center; and Newforma Contract Management, an electronic contract management program.

For Newforma Project Center, Eighth Edition, a new document control activity center has been added as a place to organize and track the issuance of record documents for coordination, permitting, bidding, construction, and field records.

The process of tracking revisions of record documents (which are mostly drawings, but could also include specifications and other documents that get released during project design and construction) can be organized in one place. “Anyone on the Building Team can access this information and retrieve the latest version of any document,” says Allen Preger, chief product officer at Newforma.

Each document in the Document Control activity center also has a complete revision history attached to it, including dates of revisions and who made them. Information about the record documents can be edited through Microsoft Excel and seamlessly updated in Newforma Project Center. You can also use the Document Control activity center to manage sheet sets from the Autodesk Revit family of products as well as related project processes such as action items, markup, RFIs, and change orders. Anyone from a subcontractor to the design architect can access the latest version of any issued project document through Newforma Info Exchange or Newforma Mobile.

The next big change in Newforma Project Center is how it handles meeting minutes. Because the Newforma Project Center Server piggybacks a client’s Microsoft Outlook Exchange Server, it can catalog and make e-mail searchable, which was the original draw of it as an enterprise PIM solution. With Eighth Edition, Newforma has added a “Create Newforma Meeting” button that allows meeting minutes to be recorded and automatically shared with the rest of the Building Team through Newforma Project Center, Newforma Info Exchange, or e-mail.

“What we found was meetings for building projects are typically scheduled in Outlook and minutes from the meeting are recorded by most of our customers using Word and then distributed,” Preger says. The problem, he says, was that there was no “actionable process” that tracked those tasks and issues to see what had been addressed and to do so over several meetings.

With Eighth Edition, meetings are still set up via Outlook and notifications are still sent to all Building Team members through e-mail; however, Newforma users don’t need to leave Outlook to plan the meeting agenda or capture meeting minutes using the new “Create Newforma Meeting” button.

You can copy discussion items and add action items (such as RFIs and submittals) from Newforma Project Center to the meeting agenda in the Newforma Meeting Minutes activity center. E-mail messages and supporting documentation can also be filed to a meeting to add context or update a resolution to an issue. Building Teams can discuss the issues at hand on their buildings rather than having meetings about what they’re going to discuss at the next meeting.

Finally, a new activity center has been added just to manage project images. Multiple members of construction teams are taking pictures daily and hundreds of project pictures can be uploaded to a project website daily. Large image files can slow down websites and clog up the entire Building Team’s inbox. Historical pictures can be critical to answering questions and resolving disputes, but IT directors often find themselves dealing not just with hundreds of large image files but also redundant copies of images and image libraries that are dumped into project folders by team members.

The Project Images activity center enables design firms and construction companies to take control of their images by applying the same powerful search index technology Newforma Project Center uses for e-mail to image files. Photos and images can be located with ease regardless of their location in project folders, and may be filtered, sorted, searched, and grouped by any image file property, including EXIF properties such as camera model, date taken, tags, and subject. If you know a certain team member uses a Canon camera, for example, you can limit your search to photos taken by a Canon.

These images can also be tagged with project keywords for search and filter-based discovery and retrieval. The Project Images activity center also uses an interface very similar to the Windows Photo Viewer interface that comes pre-installed with most desktop PCs in the U.S., including the options of thumbnail, list, and other views.

As in previous versions, all the data cataloged in Newforma Project Center is available on the Web via Newforma’s Info Exchange website (http://help.newforma.com/robohelp/robo/server/general/projects/Newforma%20Info%20Exchange%20Seventh%20Edition%20Help/Topics/Welcome_to_Newforma_Info_Exchange.htm). The ability to securely transfer large project files with automatic logging and tracking of who downloaded what and when has been significantly enhanced.

For example, project folders can also now be linked and automatically synchronized with folders on the Info Exchange server. Typically, file transfers are still handled on many construction sites by FTP sites, which have no audit trail and can be costly because FTP sites are usually hosted and priced by the number of gigabytes uploaded to them. Newforma Info Exchange can deliver role-based remote access capabilities for internal and external team members (such as clients) from any Internet-connected browser, even via Apple’s iPad.

Newforma Mobile, Newforma’s mobile solution, allows Project Center and many of its activity centers published on Info Exchange to be accessed from any smart phone including BlackBerry, iPhone, Windows Phone 7, or phones that run the Android OS. Batcheler says it was designed to work with any smart phone that has a mobile Web Internet browser in order to support both remote users as well as to provide mobile access to invited external team members.

Newforma Add-in for Autodesk Revit is a new tool for the expanding base of BIM users. As BIM has moved beyond just the design team, Newforma found that many of its general contractor and specialty subcontractor customers were using Autodesk Revit. Almost all of Newforma’s architect, structural engineering, and mechanical engineering customers have been using Revit on projects for several years.

Newforma’s Praeger says that Building Teams have used Revit successfully to more quickly produce—and revise—a coordinated set of drawings. “What they haven’t been as successful at is leveraging the additional information in that model,” he says. “That’s where we wanted to focus our efforts.”

To do this, Newforma essentially brought its Newforma Project Center functionality into Revit, as an “add-in” application with its own ribbon menu.

With one click the Revit add-in can synchronize all sheet information associated with the BIM model with Newforma Project Center’s Document Control activity center. As noted above, you can edit any of the information about the sheets in a Microsoft Excel spreadsheet. The add-in can then push that spreadsheet information back into the Revit model.

“What we found was that larger firms that had the resources on staff were building their own utilities for bulk-editing of sheet sets of 150 sheets and larger because it’s critical to keep their projects going,” Preger says. The new Revit add-in can replace these in-house utilities.

The Revit add-in also connects a new Spatial Index activity center to the Revit building model. Using “Synchronize space,” all parametric room and space information in the Revit model is synchronized and indexed with Newforma Project Center. Everyone on the Building Team can then access the latest spatial data from the Revit model without disturbing a Revit user or needing to access Revit themselves. Whether it’s a license cost issue for other Building Team members or if the design team simply does not want other team members opening Revit, this can be a huge pain point on a building project. By moving that model information into Newforma Project Center, it automatically makes it available to the whole team.

This room and space data can also be directly edited through Microsoft Excel. “Users can continue to manage room information in a spreadsheet,” Preger says. “The difference now with this new add-in is that information can be synchronized to Revit to seamlessly update the model.”

Action items, punch lists, and other project-related information can now be accessed via the Revit add-in. You can also launch standard Newforma action items inside of Revit and they will be tracked in Newforma Project Center. The Revit add-in takes advantage of Revit’s Application Program Interface, which significantly opened the program up to outside development, such as Newforma’s Revit add-in.

Newforma Contract Management supports RFIs and submittal capabilities, functions that were previously supported in Newforma Project Center’s Seventh Edition. Newforma Contract Management also manages other contract-related activities, such as change orders, punch lists, and comprehensive document and contract change management. The software is adaptable to any of the primary project delivery methods, including traditional design-bid-build, design-build, fast track, and integrated project delivery methods.

You can initiate, review, or track any change in contract information in the Contract Management activity center. The importance of relationships is also tracked throughout.

“The web of relationships—from general contractor to design architect, for example—is crucial in deciding who is responsible, who pays, and so on,” Batcheler says. “That’s why we have related items that can be attached to any RFIs, change orders, and other requests that can show why key decisions were made.”

All of the terminology is flexible because there simply is no standard naming convention that everyone in the AEC industry uses. You can change “proposal request” to “request for proposal” for a government project, for example. All contract management capabilities are available via Newforma Info Exchange to users with permission to see them.

Overall, Eighth Edition enhancements plus the three new add-ins are a robust upgrade to a product that was already the PIM category’s undisputed leader. All of the products mentioned here are scheduled to be commercially available in the second quarter of 2011 upon completion of product acceptance testing by industry-leading AEC firms participating in the Newforma Limited Customer Release program. More information: www.AECconnected.com or www.newforma.com.

Related Stories

High-rise Construction | Jul 9, 2013

5 innovations in high-rise building design

KONE's carbon-fiber hoisting technology and the Broad Group's prefab construction process are among the breakthroughs named 2013 Innovation Award winners by the Council on Tall Buildings and Urban Habitat.

Sponsored | | Jun 30, 2013

Get your 'Early Bird' entry in for BD+C 30th Annual Reconstruction Awards

The deadline is for BD+C's 30th Annual Reconstruction Awards is July 19, but if you get me a draft of your entry by July 12 (earlier if possible, please!), we'll read it and give you feedback and suggestions that could help you win. We'll give you enough time to rework your entry in time to meet the deadline. We do this "Early Bird" service to help you put together the best possible entry - one that will answer any questions our distinguished jury members may come up with. However, we must emphasize that the BD+C Reconstruction Awards program is a juried competition, so there are no guarantees you'll win. We're just trying to improve your odds. Building Design+Construction is the only publication in its field to recognize the importance of reconstruction in all its forms - historic preservation, adaptive reuse, renovation, fitouts, and reconstruction with addition. And we've been doing it for 30 years. Incidentally, reconstruction accounts for 30-35% of all revenue for AEC firms, so it's a key component of the US/Canada design and construction industry. Send your draft entry to: rcassidy@sgcmail.com. And good luck!

| Jun 28, 2013

Calculating the ROI of building enclosure commissioning

A researcher at Lawrence Berkeley National Laboratory calls building enclosure commissioning “the single-most cost-effective strategy for reducing energy, costs, and greenhouse gas emissions in buildings today.”

| Jun 28, 2013

A brief history of windows in America

Historic window experts from Hoffmann Architects look back at the origin of windows in the U.S.

| Jun 28, 2013

Building owners cite BIM/VDC as 'most exciting trend' in facilities management, says Mortenson report

A recent survey of more than 60 building owners and facility management professionals by Mortenson Construction shows that BIM/VDC is top of mind among owner professionals. 

| Jun 27, 2013

Thermal, solar control designs can impact cooling loads by 200%, heating loads by 30%

Underestimating thermal bridging can greatly undermine a building’s performance contributing to heating load variances of up to 30% and cooling load variances of up to 200%, says the MMM Group.

| Jun 20, 2013

Virtual meetings enhance design of University at Buffalo Medical School

HOK designers in New York, St. Louis and Atlanta are using virtual meetings with their University at Buffalo (UB) client team to improve the design process for UB’s new School of Medicine and Biomedical Sciences on the Buffalo Niagara Medical Campus.

| Jun 14, 2013

Purdue, industry partners test light steel framing for seismic safety

A partnership of leading earthquake engineering researchers from top U.S. and Canadian universities and design professionals from the steel industry have begun the final phase of a three-year project to increase the seismic safety of buildings that use lightweight cold-formed steel for their primary beams and columns. 

| Jun 11, 2013

Finnish elevator technology could facilitate supertall building design

KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.

| Jun 4, 2013

SOM research project examines viability of timber-framed skyscraper

In a report released today, Skidmore, Owings & Merrill discussed the results of the Timber Tower Research Project: an examination of whether a viable 400-ft, 42-story building could be created with timber framing. The structural type could reduce the carbon footprint of tall buildings by up to 75%.

boombox1
boombox2
native1

More In Category




Contractors

Contractors expect to spend more time on prefabrication, according to FMI study

Get ready for a surge in prefabrication activity by contractors. FMI, the consulting and investment banking firm, recently polled contractors about how much time they were spending, in craft labor hours, on prefabrication for construction projects. More than 250 contractors participated in the survey, and the average response to that question was 18%. More revealing, however, was the participants’ anticipation that craft hours dedicated to prefab would essentially double, to 34%, within the next five years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021