flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Take a look at Brooklyn’s Domino Sugar Refinery redevelopment

Mixed-Use

Take a look at Brooklyn’s Domino Sugar Refinery redevelopment

The master plan features market-rate and affordable housing, mixed-use space, and a waterfront park with a 5-block long “Artifact Walk.”


By David Malone, Associate Editor | April 24, 2017

Courtesy of SHoP Architects.

Brooklyn’s iconic Domino Sugar Refinery will become the centerpiece of a redevelopment project spearheaded by SHoP Architects and James Corner Field Operations for developer Two Trees Management.

The 3.3 million sf master plan replaces a city-approved master plan from 2010 and adds 60% more publicly accessible open space on a new street grid. The new development will also include office space, market-rate and affordable housing, retail, and community facilities.

The open space exists along the quarter-mile waterfront and includes a 5-block stretch known as the “Artifact Walk.” This elevated walkway incorporates into the park’s landscape the original gantry cranes, syrup tanks, screw conveyors, and other historical relics of the sugar refinery.

The development will alter Brooklyn’s skyline as the buildings will both relate to the height of the Williamsburg Bridge and also scale down to meet the neighborhood. Each building will be porous and feature a large opening to light air and light penetrate the site and spill into the neighborhood behind the development.

 

Courtesy of SHoP Architects.

 

Courtesy of SHoP Architects.

Related Stories

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 3, 2011

Hardin Construction tops out Orlando Embassy Suites

The project began in April 2011 and is expected to open in fall 2012.

| Sep 30, 2011

Kilbourn joins Perkins Eastman

Kilbourn joins with more than 28 years of design and planning experience for communities, buildings, and interiors in hospitality, retail/mixed-use, corporate office, and healthcare.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021