flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Swinerton to open its first New York City office

Contractors

Swinerton to open its first New York City office

Andrew Pearl will head up the New York City Office.


By Swinerton | June 1, 2021
Swinerton to open its first New York City office

Photo: Pixabay

   

As New York City begins its reopening phase from the more than year-long pandemic that sent office workers and companies scrambling to other states, suburbs and the outer boroughs, construction services firm Swinerton stakes its claim on the gold coast of the East with its first New York office in the company’s 133-year-old history.  Located at 292 Madison Avenue, the new office will be managed by Andrew Pearl, life-long Yankees fan and former New Yorker, who returns to his roots from Swinerton’s California headquarters to head up the New York operation.

“Despite the uncertainty due to the pandemic that adversely impacted New York City, particularly in the office market sector, Swinerton sees opportunity in crisis,” says Eric Foster, CEO of Swinerton.  “We build nationally and will connect with our long-standing clients to serve them best in one of the hardest hit areas of the country.”

Swinerton is not your typical construction services company.  It not only brings to New York its 133-year-old legacy in building expertise, but  also its self-perform capability in key trades such as drywall, concrete, doors/frames/hardware; with Timberlab, mass timber delivery and integration; SAK Builders Division 3 concrete services; Swinerton Renewable Energy; and Perq, a first-of-its kind product in collaboration with Walker Consultants that is an innovation to design, build, and deliver pre-designed and pre-engineered parking solutions in 13 months. It is betting on bringing its expertise and national reputation in building Affordable Housing, Aviation, Education, Corporate and Critical Facilities, Gaming, Healthcare, Hospitality, Interiors, Residential, Retail, Life Sciences, and Renewable Energy to New York as it builds back stronger and better. The company is currently working for Fortune 500 Corporate Services clients in Pennsylvania, Maryland, Washington D.C. and Virginia, and has already secured work in New York City.

“At Swinerton, we don’t see New York City at the end of its glory days in construction and real estate growth, and one would just need to look to Facebook’s 730,000-square-foot lease at Farley Post Office this summer as proof,” adds Andrew Pearl, Swinerton VP, Division Manager.  “As others see a decline in urban centers, in a post-COVID climate, we are targeting corporate interiors as a sector presenting for change with many more hard-walled offices as opposed to open spaces. As people return to the city, the spaces in which they live, work, and learn will need to be re-configured.”

Swinerton has thrived and survived the test of time by emerging into a $5 billion national commercial construction company with great financial strength, national clients, project diversity, and a company culture that is proud of its 100% employee ownership. Many Swinerton buildings are on the National Register of Historic Places and architectural preservation lists. It currently has 20 offices in nine states across the country and is ranked #17 on the ENR 2021 list of top contractors in the country.  The company adapted its construction strategies and pivoted to survive two World Wars, a Great Depression and a Great Recession, two global pandemics, as well as many crises and national disasters.  

“Swinerton is staying true to its DNA by expanding the markets we explore and targeting opportunities to build in locations where our clients have needs,” adds David Callis, Swinerton President and COO. “We are a very hands-on company with a white glove approach to building and feel the need to answer the call to build back better and stronger in post-pandemic New York.”

The company, which was founded in 1888 as a masonry and contracting firm, put down roots by following the post-gold rush era in Los Angeles.  When disaster struck San Francisco in 1906 and a major earthquake destroyed 28,000 structures, the only buildings left standing were built of concrete by Swinerton, making them the first to pioneer reinforced concrete as a building material to withstand the pressures of California earthquakes.

Swinerton has been a 100% employee-owned company since 1980 in which nearly 5000 employees, half of which represent the trade, share in the company’s profits and are thoroughly committed to its success. The Swinerton Foundation is a 501(c)(3) that helps build sustainable cities and neighborhoods by partnering with community-focused non-profit organizations to support health, social services, cultural, education, and environmental programs that benefit all members of the community.

“Being in the New York market has accelerated the company’s 15-year business plan to expand both geographically and through sector diversification,” concludes Andrew Pearl.  “For now, we are bullish on office interiors as our target sector and fulfilling our East Coast expansion plan.”

Related Stories

| Sep 30, 2014

The Big Room concept: Using Building Team collocation to ensure project success

Implementing collocation via the Big Room concept will remove silos, ensure a cadence for daily communication, promote collaboration, and elevate your chances for success, write CBRE Healthcare's Stephen Powell and Magnus Nilsson.

| Sep 30, 2014

USGBC, Bank of America name recipients of 2014 Affordable Green Neighborhoods Grant Program

Eleven projects have been selected for the 2014 Affordable Green Neighborhoods grant program. Each will receive $31,000 and an educational package to support their pursuit of LEED for Neighborhood Development certification.

Sponsored | | Sep 30, 2014

What are you doing to win business and improve morale?? VDC Director Kris Lengieza shares ways to do both

Bluebeam's Sasha Reed sits down with Kris Lengieza, Director of Virtual Design and Construction for Stiles Corporation, to learn how he approaches change management. SPONSORED CONTENT

Sponsored | | Sep 30, 2014

How project managers can manage technology

Not long ago, the role of a construction project manager revolved around working with people: employees, vendors, consultants, designers, subcontractors and owners. Today, project managers primarily manage information. SPONSORED CONTENT

| Sep 30, 2014

With its 'stacked volumes' scheme, 3XN wins bid to design high-rise in Sydney

By dividing the 200-meter building into five separate volumes and placing atria throughout each volume, the spaces become smaller, more intimate social environments, according to the Danish architects.

| Sep 29, 2014

10 common deficiencies in aging healthcare facilities

VOA's Douglas King pinpoints the top issues that arise during healthcare facilities assessments, including missing fire/smoke dampers, out-of-place fire alarms, and poorly constructed doorways. 

| Sep 29, 2014

Snøhetta releases final plan for terraced central library in Calgary

The competition-winning New Central Library is now in the final design stages, after two years of community engagement on the part of design firms Snøhetta and DIALOG. 

| Sep 25, 2014

Jean Nouvel unveils plans for National Art Museum of China

Of the design, Nouvel describes it as inspired by the simplicity of “a single brush stroke.” 

Sponsored | | Sep 25, 2014

Your business doesn’t always need to change

By now, the idea that organizations must adapt to maintain both relevance and market share is so ingrained that it’s been reduced to pithy sayings. But is constant adaptation always the best policy? SPONSORED CONTENT

| Sep 24, 2014

Must see: Semi-submerged hotel planned for Qatar's man-made island

Plans for a new hotel in the Persian Gulf are taking Dubai’s Palm Islands concept to a whole new level—underwater, that is.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021