flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Swinerton forms new mass timber business group

Codes and Standards

Swinerton forms new mass timber business group

Will pursue new projects being developed with mass timber.


By Peter Fabris, Contributing Editor | March 28, 2019

Courtesy Pixabay

One of the largest builders in the U.S. launched a new business unit dedicated to building projects using mass timber technology.

Swinerton Mass Timber will pursue new projects that are being developed with mass timber, and evaluate other project opportunities to determine mass timber solutions. “Utilizing this technology, we know mass timber will help us build more quickly, more safely, and deliver the most cost-efficient structures in markets nationwide,” said Swinerton CEO Jeff Hoopes in a news release.

"Our goal is not only to deliver mass timber projects across every market in the U.S., but to also support both the development and design communities in learning more about cost-effective applications of mass timber in the built environment,” said Chris Evans, one of the leaders of the new business unit. “In order to bring more projects to life, we are dedicated to helping our trusted partners understand how to best utilize this game-changing technology.”

The Swinerton Mass Timber team has multiple projects in development including: the Washington County Event Center in Hillsboro, Oregon; the Beaverton Public Safety Center in Beaverton, Oregon; the Knight Campus for Accelerating Scientific Impact in Eugene, Oregon; Pier 70 in San Francisco, California; Rena Ware Headquarters in Kirkland, Washington; and three structures at Kresge College at University of California – Santa Cruz.

Related Stories

Codes and Standards | Mar 4, 2021

Biden administration overturns Trump’s federal building design mandate

Previous order promoted classical and “traditional” architecture above others.

Codes and Standards | Mar 3, 2021

Texas freeze raises questions about risks of electrifying buildings

Gas stoves helped residents cook, boil water when power went out.

Codes and Standards | Mar 2, 2021

New Seattle building code eliminates fossil fuels for most space and water heating

Also increases on-site solar photovoltaics, reduces envelope heat loss, air leakage, and interior lighting power allowances.

Codes and Standards | Feb 25, 2021

It’s not just lumber—roofing material prices are also on the rise

Lower demand for petroleum products means less asphalt production.

Codes and Standards | Feb 23, 2021

ASHRAE Epidemic Task Force releases updated Building Readiness Guide

Includes flush calculations to reduce time and energy to clear contaminants between occupancy periods.

Codes and Standards | Feb 22, 2021

Preservation of Affordable Housing develops climate resilience strategy

Includes backup power for resident and staff “area of refuge”.

Codes and Standards | Feb 18, 2021

Construction industry moves toward comprehensive U.S. BIM standard

NIBS hosts roundtable to create coordinated program to advance collaboration.

Codes and Standards | Feb 17, 2021

Construction on international sports venues is ripe for corruption

Poor planning, complex contracting, a lack of accountability and high levels of collusion to blame.

Codes and Standards | Feb 16, 2021

Feds may fund removal of some urban highways

Senate bill proposes pilot program to reknit communities.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021