flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Sutton Tower, an 80-story multifamily development, completes construction in Manhattan’s Midtown East

Multifamily Housing

Sutton Tower, an 80-story multifamily development, completes construction in Manhattan’s Midtown East

The 850-foot tower offers 120 for-sale residences, each located on a corner, and features 10-foot cantilevers over the adjacent buildings starting at the sixth floor.


By Novid Parsi, Contributing Editor  | June 28, 2023
Sutton Tower, a new 80-story residential high-rise in Manhattan’s Midtown East neighborhood Photo: David Joshua Ford, courtesy Lendlease
Lendlease served as general contractor for Sutton Tower, a new 80-story residential high-rise in Manhattan’s Midtown East neighborhood developed by Gamma Real Estate and JVP Management. Photo: David Joshua Ford, courtesy Lendlease

In Manhattan’s Midtown East, the construction of Sutton Tower, an 80-story residential building, has been completed. Located in the Sutton Place neighborhood, the tower offers 120 for-sale residences, with the first move-ins scheduled for this summer.

The project was designed by Thomas Juul-Hansen and developed by Gamma Real Estate and JVP Management. Lendlease, the general contractor, started construction in 2018.

Lendlease constructed the building on a 6,000-sf site within a dense neighborhood. The project team used a 10-foot cantilever over the adjacent buildings on each side, starting at the sixth floor. During construction, the team built out steel decking beneath the cantilevers to access their undersides.

The project team also had to carefully coordinate deliveries to minimize disruption to the neighbors on three sides. During construction, the building’s ground-floor lobby functioned as a loading/unloading area for trucks. After the vertical construction was completed, the lobby interior was then finished.

Sutton Tower New York City_Unit Bath Photo: David Joshua Ford, courtesy Lendlease
Photo: David Joshua Ford, courtesy Lendlease 

Each of the 850-foot tower’s luxury condominiums is located on a corner. The residences feature wide-plank solid oak floors; Italian-crafted kitchens with matte lacquer cabinetry, honed slabs of Statuarietto marble, and Sub-Zero and Wolf appliances; and primary bathrooms with marble slab accent walls. The building’s limestone-clad façade leads to geometric detailing for the top mechanical floors.

Sutton Tower’s amenities cover more than 22,000 sf and include a double-height atrium, library, swimming pool, fitness center, spa suites, sports simulator room, screening room, private dining room, children’s room with an interactive mural, and a 1,300-sf sculpture garden. Because of the building’s smaller footprint, the amenities are spread across multiple floors.

On the Building Team:
Owner/developer: Gamma Real Estate and JVP Management – Sutton 58 Holding Company
Design architect: Thomas Jull-Hansen
Architect of record: Stephen B. Jacobs Group
MEP engineer: Cosentini Associates
Structural engineer: WSP
General contractor or construction manager: Lendlease

Sutton Tower was designed by Thomas Juul-Hansen and constructed by Lendlease. Photo: David Joshua Ford, courtesy Lendlease
Designed by Thomas Juul-Hansen and constructed by Lendlease, Sutton Tower offers luxury condominiums, each located on a corner. Photo: David Joshua Ford, courtesy Lendlease 
Lendlease built Sutton Tower in a dense, infill neighborhood on a 6,000-square-foot site. Photo: David Joshua Ford, courtesy Lendlease
Lendlease built Sutton Tower in a dense, infill neighborhood on a 6,000-square-foot site. Photo: David Joshua Ford, courtesy Lendlease 
Sutton Tower New York City Kitchen Photo: David Joshua Ford, courtesy Lendlease 
Photo: David Joshua Ford, courtesy Lendlease
Photo: David Joshua Ford, courtesy Lendlease 
Photo: David Joshua Ford, courtesy Lendlease
Photo: David Joshua Ford, courtesy Lendlease 
Photo: David Joshua Ford, courtesy Lendlease

 

 

Related Stories

Multifamily Housing | Feb 19, 2015

Is multifamily construction getting too frothy for demand?

Contractors are pushing full speed ahead, but CoStar Group thinks a slowdown might be in order this year.

Multifamily Housing | Feb 18, 2015

Make It Right unveils six designs for affordable housing complex

BNIM is among the six firms involved in the project.

Office Buildings | Feb 18, 2015

Commercial real estate developers optimistic, but concerned about taxes, jobs outlook

The outlook for the commercial real estate industry remains strong despite growing concerns over sluggish job creation and higher taxes, according to a new survey of commercial real estate professionals by NAIOP.

Multifamily Housing | Feb 17, 2015

NYC multifamily sales increased by 39% in 2014

For New York City as a whole, $20 million-plus deals accounted for more than half of all transactions.

Multifamily Housing | Feb 17, 2015

California launches pilot program to finance multifamily retrofits for energy efficiency

The Obama Administration and the state of California are teaming with the Chicago-based MacArthur Foundation on a pilot program whose goal is to unlock Property-Assessed Clean Energy financing for multifamily housing.

Multifamily Housing | Feb 17, 2015

Young Millennials likely to return home

Ninety percent of individuals born between 1980 and 1984 and who hold a Bachelor’s degree left home before they were 27 years hold. However, half of this group later returned to their parents’ home, according to a study by the National Longitudinal Study of Youth.

High-rise Construction | Feb 17, 2015

Work begins on Bjarke Ingels' pixelated tower in Calgary

Construction on Calgary’s newest skyscraper, the 66-story Telus Sky Tower, recently broke ground. 

Mixed-Use | Feb 13, 2015

First Look: Sacramento Planning Commission approves mixed-use tower by the new Kings arena

The project, named Downtown Plaza Tower, will have 16 stories and will include a public lobby, retail and office space, 250 hotel rooms, and residences at the top of the tower. 

Codes and Standards | Feb 12, 2015

New Appraisal Institute form aids in analysis of green commercial building features

The Institute’s Commercial Green and Energy Efficient Addendum offers a communication tool that lenders can use as part of the scope of work. 

Multifamily Housing | Feb 9, 2015

GSEs and their lenders were active on the multifamily front in 2014

Fannie Mae and Freddie Mac securitized more than $57 billion for 850,000-plus units.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021