Mancini•Duffy, a leading architectural and interiors firm, has released findings from The Coordinate, its periodic survey on workplace trends. The most recent survey indicates that less than one-quarter of the work performed in a single day requires a face-to-face interaction.
With the rise of technology, much of the workday—even the most productive morning hours—is spent corresponding via email or conference call.
The survey results also show that for employees, being able to work at times that are most productive and being able to have a choice of places to work is not a case of either/or, but of both/and.
“Employees want flexibility and choice,” said Fran Ferrone, Mancini•Duffy’s Director of Workplace Innovation.
Additional findings highlight:
• Gen X and Y’s biggest dissatisfaction is “lack of stimulating atmosphere."
• While concentration is a problem for all, it is less so for Boomers and Traditionalists, who occupy the majority of private offices.
• Despite the trend toward collaboration, all generations say “information overheard” is over-performing.
These findings are the second in a series of surveys being conducted by Mancini•Duffy this year to test the hypothesis of “the dissolution of the traditional workweek.” The next survey, addressing “sources of inspiration and motivation,” will round out the series.
Complete results (and their implications) will be published in early 2015. To participate in the Coordinate survey, visit: http://www.cvent.com/d/d4q2kp.
Contact CWI@manciniduffy.com for additional information or questions about The Coordinate.
About Mancini•Duffy
Mancini•Duffy is a full service design firm specializing in architecture, planning, interior design and graphic design services. Founded almost 100 years ago, the firm is headquartered in New York City. Also, as a member of IPID, International Partners in Design, Mancini•Duffy serves the diverse needs of its expanding multi-national client base across the U.S. and in Great Britain, Europe, East Asia and Australia. http://www.manciniduffy.com.
Related Stories
Healthcare Facilities | Apr 14, 2022
Healthcare construction veteran creates next-level IPD process for hospital projects
Can integrated project delivery work without incentives for building team members? Denton Wilson thinks so.
Industrial Facilities | Apr 14, 2022
JLL's take on the race for industrial space
In the previous decade, the inventory of industrial space couldn’t keep up with demand that was driven by the dual surges of the coronavirus and online shopping. Vacancies declined and rents rose. JLL has just published a research report on this sector called “The Race for Industrial Space.” Mehtab Randhawa, JLL’s Americas Head of Industrial Research, shares the highlights of a new report on the industrial sector's growth.
High-rise Construction | Apr 14, 2022
Seattle’s high-rise convention center nears completion
The new Washington State Convention Center Summit Building—billed as the first high-rise convention center in North America—is on track to complete most of its construction later this year.
Building Team | Apr 14, 2022
TLC Engineering Solutions, Inc. acquires Moye I.T. Consulting, LLC
TLC Engineering Solutions, Inc. (TLC) is excited to announce that Moye I.T. Consulting, LLC (Moye Consulting) has joined the TLC team, expanding the breadth of its IT and Technology capabilities, as well as its national portfolio.
Wood | Apr 13, 2022
Mass timber: Multifamily’s next big building system
Mass timber construction experts offer advice on how to use prefabricated wood systems to help you reach for the heights with your next apartment or condominium project.
AEC Tech | Apr 13, 2022
Morphosis designs EV charging station for automaker Genesis
LA-based design and architecture firm Morphosis has partnered with automotive luxury brand Genesis to bring their signature brand and styling, attention-to-detail, and seamless customer experience to the design of Electric Vehicle Charging (EVC) Stations.
AEC Tech | Apr 13, 2022
A robot automates elevator installation
Schindler—which manufactures and installs elevators, escalators, and moving walkways—has created a robot called R.I.S.E. (robotic installation system for elevators) to help install lifts in high-rise buildings.
Government Buildings | Apr 11, 2022
Milan’s new US Consulate celebrates Italian design
In Milan, Italy, the new U.S. Consulate General broke ground on April 6. Managed by Overseas Buildings Operations (OBO), a U.S. government agency that directs overseas builds, the 10-acre campus will feature a new Consulate building, as well as the restoration of the site’s historic Liberty Building and reconstruction of a pavilion on the 80,000-square-foot parade ground.
Sponsored | BD+C University Course | Apr 10, 2022
Designing with commercial and industrial insulated metal wall panels
Discover the characteristics, benefits and design options for commercial/industrial buildings using insulated metal panels (IMPs). Recognize the factors affecting panel spans and the relationship of these to structural supports. Gain knowledge of IMP code compliance.
Laboratories | Apr 7, 2022
North Carolina's latest play for biotech real estate development
The Tar Heel State is among a growing number of markets rolling out the welcome mat for lab spaces.