flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

| Feb 28, 2014

Steel Joist Institute standards open for review

The 2015 draft of the Steel Joist Institute’s “Single Joist Standard Specification for K-, LH-, and DLH-Series and Joist Girders” will be available for public review until May 31, 2014.

| Feb 28, 2014

Metcalf Construction wins key reversal from federal appeals court in Hawaii on military contract

Metcalf spent more than $76 million on a military construction project and sued to recoup costs.

| Feb 19, 2014

Obama Administration moves to boost fuel efficiency standards on heavy-duty vehicles

The Obama Administration wants to boost fuel efficiency of medium- and heavy-duty trucks for models made in 2019 and later.

| Feb 19, 2014

Net Positive Energy + Water is latest green certification standard

The advancement of sustainable construction has reached a new milestone with the development of Net Positive Energy+Water, a new green building certification standard that aims to improve net zero approaches to energy and water conservation.

| Feb 19, 2014

Obama’s climate resilience panel says PVs, cool roofs should be part of solution

Among the suggestions were rooftop solar energy systems and cool roofs, which could be encouraged by policies from local governments.

| Feb 19, 2014

OSHA proposes three-year postponement of crane operator certification requirement

OSHA’s proposal to postpone the compliance date for crane operator certification by three years was made official on Feb. 7 when it was published in the Federal Register.

| Feb 19, 2014

USGBC introduces new online educational platform

The U.S. Green Building Council has introduced “Education @USGBC” a new educational platform.

| Feb 17, 2014

Channeling weather forecasts to building systems can yield significant energy savings

Using weather forecasts to predict outdoor temperature changes can lead to significant energy savings, exceeding 10%, researchers say.

| Feb 17, 2014

Lawmakers may take away control of Florida hospital project from the VA

The project is $100 million over budget and has missed its scheduled completion date.

| Feb 17, 2014

Business, labor at odds over toughening of OSHA silica dust rule

OSHA says the rules will protect workers and prevent 700 fatalities annually. Others say the rules would hurt businesses and jobs. 

boombox1
boombox2
native1

More In Category


Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021