flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Jun 11, 2015

Steel Framing Alliance updates ‘Thermal Design and Code Compliance for Cold-Formed Steel Walls’ design guide

Includes results of new tests and addresses IECC and ASHRAE compliance paths.

Codes and Standards | Jun 11, 2015

Helena, Mont., may charge commercial developers a fee to fund public art

The fee would apply to new construction or alteration of nonresidential buildings of at least 20,000 sf.

Codes and Standards | Jun 11, 2015

DBIA releases new document on choosing a project delivery method

Provides owners and others with factors to consider when choosing the best method of delivery for their project.

High-rise Construction | Jun 5, 2015

Japanese policymakers discuss mandate for toilets in elevators

This quirky-sounding building code is a safety measure for the earthquake-prone nation.

Codes and Standards | Jun 4, 2015

OSHA publishes guide to restroom access for transgender workers

The guide advises employers to allow employees to use restrooms that correspond to their gender identity.

Codes and Standards | Jun 4, 2015

Guide helps Building Teams maximize team integration

The guide includes forms to support a two- to four-hour workshop to help an owner select the most appropriate delivery strategy. 

Codes and Standards | Jun 4, 2015

NIBS, RICS to explore P3 as tool to achieve high-performance buildings

The idea of applying the P3 concept more to buildings, and especially building performance, is a potentially promising new avenue in the U.S., according to the trade groups.

University Buildings | May 30, 2015

Texas senate approves $3 billion in bonds for university construction

For the first time in nearly a decade, Texas universities could soon have some state money for construction.

Multifamily Housing | May 30, 2015

Energy Department releases resources to assess building energy benchmarking policies, programs

The new handbook demonstrates methodologies using real data from New York City.

Codes and Standards | May 27, 2015

Construction industry concerns with ‘Waters of the U.S.’ rule remain

EPA and Corps of Engineers rule may lead to a longer, more expensive permitting process

boombox1
boombox2
native1

More In Category


Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021