flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Codes and Standards

Supply chain constraints, shifting consumer demands adding cost pressures to office fit-outs

Contractors expect continuing increases in material lead time, project timelines this year.
 


By Peter Fabris, Contributing Editor | April 25, 2022
Office fit out
Courtesy Pexels.

Cushman & Wakefield’s 2022 Americas Office Fit-Out Cost Guide found supply chain constraints and shifting consumer demands will continue to add pressure to costs, both in materials and labor.
 
Increases in construction and customer demand for durable and non-durable goods have driven supply chain disruptions over the past two years. COVID-19 outbreaks and labor shortages have also wreaked havoc through ports and on trucking, transportation, and distribution capacities. The supply chain stress indices for both China and the U.S. ended 2021 up over 40% from pre-pandemic levels.
 
For office construction and fit-outs, these stressors have created increased delays, greater uncertainty, and higher costs. There appears to be some light at the end of the tunnel, though,
as the supplier delivery index that measures manufacturer delays has been receding
since the middle of 2021, the report says.
 
The waning of the pandemic may add more fuel to cost pressures, however, as office tenants are targeting the first half of 2022 for employees to return to a more standard office attendance model. “As office space usage increases, we expect organizations will expand their piloting and testing of different types of layouts related to hybrid work,” the report says. “This is likely to increase the amount of fit-out and office space construction activity in the coming quarters, creating even more demand for materials and labor.”

Related Stories

Codes and Standards | Jul 12, 2018

Developer says net zero Salt Lake City apartment high-rise built at standard cost

Off-site solar, and mechanical/electrical system savings aid the achievement.

Codes and Standards | Jul 11, 2018

D.C. local worker requirement not being met

Government doing little to verify self-reported project data.

Codes and Standards | Jul 10, 2018

Carbon emissions in cement production threaten GHG reduction goals

Cement is essential to many infrastructure projects that address climate change.

Codes and Standards | Jul 10, 2018

DOE’s Better Buildings Summit to be held in Cleveland, August 21-23

Agenda includes technical training and networking opportunities.

Codes and Standards | Jul 6, 2018

Delos and HDR will co-develop wellness design tools and collaborate on research

WELL Building Standard pioneer teams with architects to advance wellness innovations in the built environment.

Codes and Standards | Jul 5, 2018

BREEAM New Construction standard launched in U.S.

Follows successful launch of BREEAM In-Use standard.

Codes and Standards | Jun 29, 2018

Nearly half of nonresidential construction projects now delivered by design-build

‘Alternative’ method now mainstream for nonresidential, highway/street, and water/wastewater construction projects.

Codes and Standards | Jun 28, 2018

Modular construction may be key to relieving housing crunch

May be only way to meet needs as ranks of construction workers decline.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021