flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Super Bowl stadium helps alleviate Atlanta’s flood problems

Codes and Standards

Super Bowl stadium helps alleviate Atlanta’s flood problems

Capacity to store more than 2 million gallons of storm water on site.


By Peter Fabris, Contributing Editor | February 15, 2019

Courtesy Pixabay

Mercedes-Benz Stadium, site of Super Bowl LIII, was designed to capture enormous amounts of storm water runoff.

Home to the NFL’s Atlanta Falcons and Major League Soccer’s Atlanta United FC, the facility opened in August 2017 as North America’s first LEED platinum stadium. The project accumulated 88 out of a maximum 100 points, the highest LEED rating ever for a sports facility.

The venue has a capacity to store over 2 million gallons of storm water on site. A 680,000-gallon cistern captures rainwater that is used for landscape irrigation and to replenish the site’s cooling tower.

Located within the flood-prone Proctor Creek Watershed, the site includes several bioswales that were created to improve water quality and serve as an alternative to storm sewers.

Related Stories

Codes and Standards | Nov 14, 2018

Obsolete safety standards may have been used in cleanup of former naval shipyard

San Francisco redevelopment site work may have been racked by fraud.

Codes and Standards | Nov 13, 2018

New York City’s new construction safety requirements are delayed

Some contractors say they weren’t ready for ‘massive initiative’.

Codes and Standards | Nov 9, 2018

Cities have multiple strategies to reduce parking requirements

Each community has to find its own mix of solutions.

Codes and Standards | Nov 8, 2018

Denver replaces green roof mandate with cool roof option

Less costly light-colored roofs can cut project costs by about 1.5%.

Codes and Standards | Nov 7, 2018

New report addresses sound transmission of wood-framed assemblies

AWC document provides empirical sound transmission model.

Codes and Standards | Nov 6, 2018

AIA releases 13 new and updated contract documents

Includes new Contractor-Subcontractor Master Agreement.

Codes and Standards | Nov 1, 2018

Several barriers holding back widespread construction of zero energy buildings

Code improvements and voluntary programs could add momentum.

Codes and Standards | Oct 31, 2018

Boston’s new flood protection plan centers on new parks

Initiative would add 67 acres of public open space.

Codes and Standards | Oct 30, 2018

San Francisco plans tougher seismic building codes

Recommendations include addressing geotechnical issues like those faced by Millennium Tower.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021