According to the Associated General Contractors of America, 86% of construction firms in the U.S. are having problems finding skilled workers, including carpenters, equipment operators, and laborers. Sundt Construction does not want to be one of them.
The Arizona-based firm opened its own training center for craft employees in response to the labor shortages in the industry. Sundt’s Center for Craft Excellence, in Phoenix, offers training across many specialties, including equipment operation, pipefitting, mechanics, industrial carpentry, welding, ironworking, and electrical.
“Finding experienced people has been difficult since the economy shrank. There were a lot of people who left the industry and haven’t returned,” Sundt Craft Training Manager Sean Ray said in a statement. “This facility isn’t just helping us train the next generation of craft workers, it’s allowing us to invest in our people and the skills they use every day on our jobs. It’s a winning situation for everyone: our customers, our craft workers and our company.”
The center can also administer the National Craft Assessment and Certification Program (NCACP), and guide employees to attain National Center for Construction Education and Research (NCCER) Certified Plus status.
Related Stories
| May 31, 2012
New School’s University Center in NYC topped out
16-story will provide new focal point for campus.
| May 31, 2012
Day & Zimmermann taps Jobe for ECM VP
Ken Jobe, a senior executive with 30+ years of industry-related experience, joins Day & Zimmermann to expand footprint in the process & industrial markets.
| May 31, 2012
Perkins+Will-designed engineering building at University of Buffalo opens
Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.
| May 30, 2012
Construction milestone reached for $1B expansion of San Diego International Airport
Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.
| May 30, 2012
Pringle Brandon in discussions to join forces with Perkins+Will
The London offices would be known as Pringle Brandon Perkins+Will.
| May 30, 2012
Boral Bricks announces winners of “Live.Work.Learn” student architecture contest
Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.
| May 30, 2012
Hill International to manage construction of Al Risafa Stadium in Iraq
The three-year contract has an estimated value to Hill of approximately $3.3 million.
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.