Summit Design + Build, LLC recently announced the firm’s selection as general contractor for 1313 W. Randolph Street, the conversion of a historic industrial loft building into a mixed-use facility, in Chicago’s West Loop.
AP MCG Randolph Investors LLC is the owner/developer of the project.
The 130,000 square foot building, which was completed in 1927 and was home to the Wholesale Florist Exchange, is being completely renovated and will feature 70 unique loft-style apartments with Italian-style kitchens, modern finishes and polished concrete floors; approximately 27,000 square feet of ground floor retail; a lower level parking garage; and a fourth floor common amenity space.
The exterior of the building which features distinctive cast-in-place concrete facades decorated with Art Deco-style floral motifs and prominent ribbed concrete piers will remain intact and the ground level storefronts will utilize the original building openings.
Summit Design + Build’s Mark Heffron, senior project manager, Bryana Yergler, project engineer II, and John Marosi, superintendent, will be responsible for the on-site construction of 1313 W. Randolph Street.
Hartshorne Plunkard Architecture is the project architect. Completion is scheduled for third quarter 2012. BD+C
Related Stories
| Apr 16, 2012
Drake joins EYP as science and technology project executive
Drake’s more than 30 years of diversified design and project delivery experience spans a broad range of complex building types.
| Apr 16, 2012
$80 million in export financing for solar project in India
The project, “Rajasthan Sun Technique Energy Private Limited,” is a subsidiary of Reliance Power and is being co-financed by the Asian Development Bank and FMO, the Dutch development bank.
| Apr 13, 2012
Arcadis merges with Davis Langon & Seah
Merger will help company expand business in Asia.
| Apr 13, 2012
Goettsch Partners designs new music building for Northwestern
The showcase facility is the recital hall, an intimate, two-level space with undulating walls of wood that provide optimal acoustics and lead to the stage, as well as a 50-foot-high wall of cable-supported, double-skin glass
| Apr 13, 2012
Best Commercial Modular Buildings Recognized
Judges scored building entries on a number of criteria including architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete, while marketing pieces were judged on strategy, implementation, and quantifiable results. Read More
| Apr 12, 2012
Solar PV carport, electrical charging stations unveiled in California
Project contractor Oltman Construction noted that the carport provides shaded area for 940 car stalls and generates 2 MW DC of electric power.
| Apr 11, 2012
Shawmut appoints Tripp as business development director
Tripp joined Shawmut in 1998 and previously held the positions of assistant superintendent, superintendent, and national construction manager.
| Apr 11, 2012
Corgan & SOM awarded contract to design SSA National Support Center
The new SSA campus is expected to meet all Federal energy and water conservation goals while achieving LEED Gold Certification from the United States Green Building Council.
| Apr 11, 2012
C.W. Driver completes Rec Center on CSUN campus
The state-of-the-art fitness center supports university’s goal to encourage student recruitment and retention.