Summit Design + Build, LLC recently completed the new 12,000-sq. ft. LEED certified retail center known as Park Place in Northbrook, Ill. The firm also recently completed two retail build-outs within Park Place. The Equitable Group, Inc. is the owner/developer for the project.
Summit was responsible for the complete gut and renovation of the former auto repair shop which required the partial demolition of the existing building, while maintaining the integrity of the original 100 year-old structure, and significant re-grading and landscaping of the site.
Summit Design + Build was subsequently retained by Caribou Coffee to perform a 1,900 sq. ft. build-out of a full-service café featuring a custom brick fireplace and an outside patio at the northernmost end of the building. Sherwin-Williams also utilized Summit's services to complete their build-out of a 4,000 sq. ft. paint store at the southern end of the property. An additional 5,200 sq. ft. of space, which can be divisible into two or three additional stores, is still available for lease.
Summit Design + Build's David A. Brown, project manager, and Jeff Harwood, superintendent, were responsible for the on-site construction of Park Place and the Caribou Coffee and Sherwin-Williams build-outs.
SAS Architects and Planners provided architectural services for the project. Jonathan Plotkin and Oliver Plotkin of Chicago-based Endurance Retail Partners LLC are the exclusive marketing agents for the property. BD+C
Related Stories
| May 15, 2012
Don’t be insulated from green building
Examining the roles of insulation and manufacturing in sustainability’s growth.
| May 15, 2012
National Tradesmen Day set for Sept. 21
IRWIN Tools invites the nation to honor "The Real Working Hands that Build America and Keep it Running Strong".
| May 15, 2012
SAGE Electrochromics to become wholly owned subsidiary of Saint-Gobain
This deal will help SAGE expand into international markets, develop new products and complete construction of the company’s new, state-of-the-art manufacturing facility in Faribault, Minn.
| May 14, 2012
Codes harvest rainwater
IAPMO’s Green Plumbing and Mechanical Code Supplement could make rainwater harvesting systems commonplace by clearly outlining safe installation and maintenance practices.
| May 14, 2012
Plumbing research coalition to study drainline transport issue
The effort is aimed at determining if decreasing levels of water flow––caused by increasingly efficient plumbing fixtures––are sufficient to clear debris from plumbing pipes.
| May 14, 2012
SOM to break ground on supertall structure in China
The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.
| May 14, 2012
Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons
Supertall two-tower complex located in Seoul’s Yongsan International Business District.
| May 14, 2012
SMPS and Deltek announce alliance
A/E/C industry leaders partner to advance technology’s role in design firm marketing and business development.
| May 14, 2012
ArchiCAD e-Specs integration unveiled
Architects, engineers and construction professionals use InterSpec’s e-SPECS products on thousands of projects annually to maintain synchronization between construction models, drawings, and project specifications.
| May 11, 2012
2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution
Download the complete White Paper, Chapters 1-10