Summit Design + Build, LLC recently completed the new 12,000-sq. ft. LEED certified retail center known as Park Place in Northbrook, Ill. The firm also recently completed two retail build-outs within Park Place. The Equitable Group, Inc. is the owner/developer for the project.
Summit was responsible for the complete gut and renovation of the former auto repair shop which required the partial demolition of the existing building, while maintaining the integrity of the original 100 year-old structure, and significant re-grading and landscaping of the site.
Summit Design + Build was subsequently retained by Caribou Coffee to perform a 1,900 sq. ft. build-out of a full-service café featuring a custom brick fireplace and an outside patio at the northernmost end of the building. Sherwin-Williams also utilized Summit's services to complete their build-out of a 4,000 sq. ft. paint store at the southern end of the property. An additional 5,200 sq. ft. of space, which can be divisible into two or three additional stores, is still available for lease.
Summit Design + Build's David A. Brown, project manager, and Jeff Harwood, superintendent, were responsible for the on-site construction of Park Place and the Caribou Coffee and Sherwin-Williams build-outs.
SAS Architects and Planners provided architectural services for the project. Jonathan Plotkin and Oliver Plotkin of Chicago-based Endurance Retail Partners LLC are the exclusive marketing agents for the property. BD+C
Related Stories
High-rise Construction | Mar 12, 2015
Developers confirm Renzo Piano’s contribution in Sydney harbor overhaul
If the entire development is approved, One Sydney Harbour will be Piano’s second project in Australia.
High-rise Construction | Mar 12, 2015
Foster and Partners designs 'The One' in Toronto
Developer Sam Mizrahi worked with Foster and Partners and Core Architects to design Toronto's tallest skyscraper aside from the CN Tower, The One, which will house a luxury shopping mall and condos.
Contractors | Mar 12, 2015
Construction demand exploding in 2015, but costs complicate recovery
Raw materials and labor costs temper expectations for soaring profits.
Codes and Standards | Mar 12, 2015
Energy Trust of Oregon offers financial incentives for net-zero buildings
The organization is offering technical assistance along with financial benefits.
BIM and Information Technology | Mar 11, 2015
Google plans to use robots, cranes to manipulate modular offices at its new HQ
Its visions of “crabots” accentuate the search-engine giant’s recent fascination with robotics and automation.
Sports and Recreational Facilities | Mar 11, 2015
Foster + Partners wins bid for 2022 World Cup centerpiece stadium in Qatar
Norman Foster described the design as “an exciting step forward in stadium design—it will be the first to break the mold of the free-standing suburban concept, and instead anticipates the grid of this future city.”
Architects | Mar 10, 2015
German architect Frei Otto named 2015 Pritzker Architecture Prize laureate
The news comes a day after the visionary architect, 89, died in his native Germany.
Modular Building | Mar 10, 2015
Must see: 57-story modular skyscraper was completed in 19 days
After erecting the mega prefab tower in Changsha, China, modular builder BSB stated, “three floors in a day is China’s new normal.”
Sponsored | Metals | Mar 10, 2015
Metal Building Systems: A Rising Star in the Market
A new report by the Metal Building Manufacturer's Association explains the entity's efforts in refining and extending metal building systems as a construction choice.
Retail Centers | Mar 10, 2015
Retrofit projects give dying malls new purpose
Approximately one-third of the country’s 1,200 enclosed malls are dead or dying. The good news is that a sizable portion of that building stock is being repurposed.