flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Summit Design + Build completes build-out for Office Concepts

Summit Design + Build completes build-out for Office Concepts

The project is seeking LEED ID Silver certification from the U.S. Green Building Council.


By By BD+C Staff | April 30, 2012
The Office Concepts build-out included approximately 15,000-sf of office and 15
The Office Concepts build-out included approximately 15,000-sf of office and 15,000-sf of warehouse

Concepts, Inc., a distributor of office furniture, workplace solutions and office design services.

The project is seeking LEED ID Silver certification from the U.S. Green Building Council. The Office Conceptā€™s build-out included approximately 15,000-sf of office and 15,000-sf of warehouse.Ā The space was designed to highlight their various product lines with varying ceiling heights and lighting in a dramatic open office layout. Other features include two glass conference rooms and a cafĆ© and training room at the rear of the building which overlooks the Chicago River. Some of the LEED design principals included were high efficiency mechanical units and hot water heaters, locally produced materials, high recycled content/low emitting off gassing construction materials and low water consumption fixtures making the project not only energy efficient but a healthy building for its occupants.Ā Ā Ā Ā 

Summit Design + Buildā€™s Dave Mooney, senior project manager, Pat J. Lynn, project engineer, and Rodger Meyer, superintendent, were responsible for the on-site construction of Office Concepts, Inc. SKJN Architekten was the project architect. BD+C

Related Stories

| Jan 27, 2012

Columbia Universityā€™s New Core Laboratory aims for LEED Silver

Construction manager Sordoni Construction Co. along with the design team of Payette Architects and Vanderweil Engineers will provide design and construction services to renovate the majority of the existing Core Lab building to create the new Lamont Center for Bio-Geochemistry.

| Jan 26, 2012

Three dead, 16 missing in Rio buildings collapse

The buildings, one 20 floors high, collapsed on Wednesday night in a cloud of dust and smoke just one block away from the city's historic Municipal Theater.

| Jan 26, 2012

Siemens launches smoke detection knowledge center

New knowledge center web site demonstrates efficacy of smoke detection.Ā 

| Jan 26, 2012

Hendrick Construction completes Osso Restaurant in Charlotte

Designed by FranƧois Fossard, Osso's upscale interior includes tapered, twisted decorative columns and an elegant fireplace in the center of the lounge.Ā 

| Jan 26, 2012

HOK partners with USGBC on design of Haiti children's center

Passive design principles give form to a sustainable, restorative environment for the children of Haiti.

| Jan 26, 2012

American Standard names Gould as president and CEO

Gould succeeds Don Devine, who led the successful turnaround of American Standard Brands.

| Jan 26, 2012

Summit Design+Build completes law office in Chicago

Applegate & Thorne-Thomsen's new office suite features private offices, open office area, conference rooms, reception area, exposed wood beams and columns, and exposed brick.Ā 

| Jan 24, 2012

New iPad app ready for prime time

Siemensā€™ versatile application connects users to APOGEE BAS control and monitoring functions via wireless network connectivity. The application directly interacts with BACnet/IP and Siemens APOGEE P2 field panels.Ā 

| Jan 24, 2012

Vyhanek joins Thornton Tomasettiā€™s Kansas City office

Vyhanek will assemble a new MEP team in the Midwest to support Building Performance and Property Loss Consulting practices.Ā 

| Jan 24, 2012

U of M installs new lighting at Crisler Player Development Center

Energy efficient lighting installed at PDC reduce costs and improves player performance.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Ā