flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Summit Design + Build completes build-out for Office Concepts

Summit Design + Build completes build-out for Office Concepts

The project is seeking LEED ID Silver certification from the U.S. Green Building Council.


By By BD+C Staff | April 30, 2012
The Office Concepts build-out included approximately 15,000-sf of office and 15
The Office Concepts build-out included approximately 15,000-sf of office and 15,000-sf of warehouse

Concepts, Inc., a distributor of office furniture, workplace solutions and office design services.

The project is seeking LEED ID Silver certification from the U.S. Green Building Council. The Office Concept’s build-out included approximately 15,000-sf of office and 15,000-sf of warehouse. The space was designed to highlight their various product lines with varying ceiling heights and lighting in a dramatic open office layout. Other features include two glass conference rooms and a café and training room at the rear of the building which overlooks the Chicago River. Some of the LEED design principals included were high efficiency mechanical units and hot water heaters, locally produced materials, high recycled content/low emitting off gassing construction materials and low water consumption fixtures making the project not only energy efficient but a healthy building for its occupants.    

Summit Design + Build’s Dave Mooney, senior project manager, Pat J. Lynn, project engineer, and Rodger Meyer, superintendent, were responsible for the on-site construction of Office Concepts, Inc. SKJN Architekten was the project architect. BD+C

Related Stories

| Apr 10, 2012

JE Dunn completes two medical office buildings at St. Anthony’s Lakewood, Colo. campus

Designed by Davis Partnership Architects, P.C., Medical Plaza 1 and 2 are four-story structures totaling 96,804-sf and 101,581-sf respectively.

| Apr 10, 2012

THINK [about architecture] Scholarship enters 15th year

Students are invited to submit two-minute creative videos that illustrate how they interact with their school's design and what the space makes possible.

| Apr 10, 2012

Structured Development & Bucksbaum close on new retail site in Chicago

The site is the location of New City, a mixed-use development that will feature 370,000-sf of retail space and 280 residential rental units.

| Apr 10, 2012

Moriarty & Associates selected as GC for Miami’s BrickellHouse Condo

Construction of the 46-story development is schedule to get underway this summer and be completed in 2014.

| Apr 6, 2012

Flat tower green building concept the un-skycraper

A team of French designers unveil the “Flat Tower” design, a second place winner in the 2011 eVolo skyscraper competition.

| Apr 6, 2012

National Association of Women in Construction forum to be hosted in Philadelphia

The April Forum, titled “Declare your Independence!” will feature educational sessions on topics ranging from Managing the Generation Gap and Dealing with Contract language across state borders to Strategic and Succession Planning.

| Apr 6, 2012

Rooftop solar energy program wins critical approval from L.A. city council

Los Angeles Business Council applauds decision allowing LADWP to create new national model for rooftop solar energy

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021