flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Summit Design + Build completes build-out for Office Concepts

Summit Design + Build completes build-out for Office Concepts

The project is seeking LEED ID Silver certification from the U.S. Green Building Council.


By By BD+C Staff | April 30, 2012
The Office Concepts build-out included approximately 15,000-sf of office and 15
The Office Concepts build-out included approximately 15,000-sf of office and 15,000-sf of warehouse

Concepts, Inc., a distributor of office furniture, workplace solutions and office design services.

The project is seeking LEED ID Silver certification from the U.S. Green Building Council. The Office Concept’s build-out included approximately 15,000-sf of office and 15,000-sf of warehouse. The space was designed to highlight their various product lines with varying ceiling heights and lighting in a dramatic open office layout. Other features include two glass conference rooms and a café and training room at the rear of the building which overlooks the Chicago River. Some of the LEED design principals included were high efficiency mechanical units and hot water heaters, locally produced materials, high recycled content/low emitting off gassing construction materials and low water consumption fixtures making the project not only energy efficient but a healthy building for its occupants.    

Summit Design + Build’s Dave Mooney, senior project manager, Pat J. Lynn, project engineer, and Rodger Meyer, superintendent, were responsible for the on-site construction of Office Concepts, Inc. SKJN Architekten was the project architect. BD+C

Related Stories

| Sep 6, 2012

Young Spirit of Nature Wood Architecture award to Tiina Antinoja

The award is given for a student work in which wood as a building material has a central role.

| Sep 6, 2012

CPPI awarded $30.3 million contract for University of Florida’s Harrell Medical Education Building

The specialized interdisciplinary learning environment will serve as a focal point for integration and program development for all primary care educational activities in the College of Medicine.

| Sep 5, 2012

AECOM acquires BKS and KPK

Firm expands operations into South Africa and Asia.

| Sep 5, 2012

Pagano joins Thornton Tomasetti as Vice President in Newark office

Pagano is a Certified Energy Planner and Certified Energy Manager through the Association of Energy Engineers.

| Aug 30, 2012

John S Clark Co. completes teaching lab at UNC Wilmington

Three-story building provides offices, classrooms, and labs.

| Aug 29, 2012

BOND completes South Cove Community Health Center

$11 million, 21,000 square foot community health center opens in Quincy, Mass.

| Aug 29, 2012

Mamayek joins HDR as Design Principal in Boston

He will work closely with the Executive Committee and business group leaders to expand and promote HDR’s Design Excellence initiatives in the Northeast region.

| Aug 28, 2012

McCarthy begins construction on transportation center at Bob Hope Airport

Designed to meet LEED silver certification standards, the facility will feature unique, above ground base isolators that will resist a maximum credible earthquake.

| Aug 28, 2012

Wisnewski Blair & Associates changes name to HGA Mid-Atlantic

New name reflects firm's growing design resources on East Coast.

| Aug 24, 2012

Meis heads to Woods Bagot Sport

Staples Center, Paul Brown Stadium architect to leverage global studio to serve clients worldwide.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021