flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Summit Design + Build completes build-out for Office Concepts

Summit Design + Build completes build-out for Office Concepts

The project is seeking LEED ID Silver certification from the U.S. Green Building Council.


By By BD+C Staff | April 30, 2012
The Office Concepts build-out included approximately 15,000-sf of office and 15
The Office Concepts build-out included approximately 15,000-sf of office and 15,000-sf of warehouse

Concepts, Inc., a distributor of office furniture, workplace solutions and office design services.

The project is seeking LEED ID Silver certification from the U.S. Green Building Council. The Office Concept’s build-out included approximately 15,000-sf of office and 15,000-sf of warehouse. The space was designed to highlight their various product lines with varying ceiling heights and lighting in a dramatic open office layout. Other features include two glass conference rooms and a café and training room at the rear of the building which overlooks the Chicago River. Some of the LEED design principals included were high efficiency mechanical units and hot water heaters, locally produced materials, high recycled content/low emitting off gassing construction materials and low water consumption fixtures making the project not only energy efficient but a healthy building for its occupants.    

Summit Design + Build’s Dave Mooney, senior project manager, Pat J. Lynn, project engineer, and Rodger Meyer, superintendent, were responsible for the on-site construction of Office Concepts, Inc. SKJN Architekten was the project architect. BD+C

Related Stories

| Dec 21, 2012

ABI gains for fourth straight month

Positive business conditions for all building sectors.

| Dec 17, 2012

CSM Group names recipient of the CSM Architect Fellowship Grant

With the money from the grant, Harlow has chosen to use it entirely for the Chapter of American Institute of Architecture Student’s Freedom by Design Program at Andrews University.

| Dec 9, 2012

AIA: Laboratory design, building for breakthrough science

To earn 1.0 AIA/CES learning units, study the article carefully and take the exam.

| Dec 9, 2012

The owner’s perspective: high-rise buildings

Douglas Durst on the practicalities of development: “You must think about a building from the inside out.”

| Dec 9, 2012

Greenzone pop quiz

Greenbuild attendees share their thoughts with BD+C on the SAGE modular classroom.

| Dec 9, 2012

Modular classroom building makes the grade

SAGE modular classroom opens eyes, minds at Greenbuild 2012.

| Dec 9, 2012

14 great solutions

Welcome to the third installment of Building Design+Construction’s “Great Solutions,” highlighting 14 innovative technologies and products that you can put to work in your next project.

| Dec 9, 2012

AEC professionals cautiously optimistic about commercial construction in ’13

Most economists say the U.S. is slowly emerging from the Great Recession, a view that was confirmed to some extent by an exclusive survey of 498 BD+C subscribers whose views we sought on the commercial construction industry’s outlook on business prospects for 2013.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021