flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Summer assignments: 2019 K-12 school construction costs

K-12 Schools

Summer assignments: 2019 K-12 school construction costs

Using RSMeans data from Gordian, here are the most recent costs per square foot for K-12 school buildings in 10 cities across the U.S.


By Gordian | July 15, 2019
Summer assignments: 2019 K-12 school construction costs

Photo by Pixabay  

    

For students, summer is a time of freedom and fun. For schools, summer is a time to ramp up construction work, complete safety upgrades, and renovate academic, athletic, and artistic spaces. Schools plan these projects well in advance of when they actually start, and they use accurate construction cost data to forecast prices and to budget appropriately. 

RSMeans data from Gordian features more than 100 building models, including various types of schools. These localized models allow architects, engineers, and construction professionals to quickly and accurately create conceptual estimates for future builds.

The table below shows the most recent cost to build a school per square foot in cities in several American states. Visit rsmeans.com/bdandc for more information about RSMeans data.

 

 

Related Stories

| Oct 22, 2012

Two-Hour Curtain Wall Lets Light In and Keeps Fire Out at Prairie Hills Junior High School

New school’s south-facing elevation features a glazed aluminum curtain wall that incorporates PPG Solarblue and PPG Solarban 60 glazing.

| Sep 7, 2012

Net-zero energy pioneers on the el-hi frontier

Getting to net-zero is not easy, but the promise of eliminating energy bills and using state-of-the-art technology as a learning lab can make a compelling case to reach for net-zero.

| Sep 7, 2012

The keys to success in the K-12 school market

When educators and school administrators describe their vision for new K-12 school buildings as ‘21st-century learning spaces,’ they’re not exaggerating. Many new schools are truly different in concept from their counterparts of only a few years ago.

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jul 20, 2012

K-12 Schools Report: ‘A lot of pent-up need,’ with optimism for ’13

The Giants 300 Top 25 AEC Firms in the K-12 Schools Sector.

| Jul 2, 2012

Plumosa School of the Arts earns LEED Gold

Education project dedicated to teaching sustainability in the classroom.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category




K-12 Schools

Inclusive design strategies to transform learning spaces

Students with disabilities and those experiencing mental health and behavioral conditions represent a group of the most vulnerable students at risk for failing to connect educationally and socially. Educators and school districts are struggling to accommodate all of these nuanced and, at times, overlapping conditions.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021