Inspired by the lagging productivity and efficiencies in the construction industry, Suffolk recently launched its most recent Smart Lab location, in Los Angeles.
Smart Labs were designed as a physical manifestation of the company’s “build smart” approach to planning and managing complex construction projects. They are equipped with interactive technologies such as a data wall, a huddlewall, a virtual reality CAVE (cave automatic virtual environment), and jobsite feeds. The data wall provides predictive analytics and operational performance indicators to measure critical areas of business, while the huddlewall facilitates Lean pull planning meetings and helps integrate 3D, 4D, and 5D models for maximum project efficiency.
See Also: The construction industry has a problem, and women are going to solve it
“Our Smart Lab in Los Angeles is on the front line of Suffolk’s industry revolution on the West Coast and will allow us to replicate our proven processes and add significant value for clients in this important, growing market,” said Chris Mayer, Chief Innovation Officer, Suffolk, in a release.
The Los Angeles Smart Lab joins Suffolk’s existing Smart Labs in San Francisco, New York City, Miami, Tampa, Dallas, and Boston.
Related Stories
| Mar 26, 2012
McCarthy tops off Math and Science Building at San Diego Mesa College
Designed by Architects | Delawie Wilkes Rodrigues Barker, the new San Diego Mesa College Math and Science Building will provide new educational space for students pursuing degree and certificate programs in biology, chemistry, physical sciences and mathematics.
| Mar 26, 2012
Los Angeles County to host free green building training
Opportunity for residential and commercial building professionals to gain insight on state and county green building standards and regulations.
| Mar 26, 2012
Ball State University completes nation's largest ground-source geothermal system
Ball State's geothermal system will replace four aging coal-fired boilers to provide renewable power that will heat and cool 47 university buildings, representing 5.5-million-sf on the 660-acre campus.
| Mar 22, 2012
Hawaiian architecture firm chooses FRP trellis system over traditional materials
MGA Architecture plans to add five more trellis systems on the neighboring building.
| Mar 22, 2012
Moline Public Library uses copper as an exterior building material
Architects incorporate decorative copper panels to create the look of a heavy plate copper shingle.
| Mar 21, 2012
10 common data center surprises
Technologies and best practices provide path for better preparation.
| Mar 21, 2012
ABI remains positive for fourth straight month
Highest spike in inquiries for new projects since 2007.
| Mar 21, 2012
Iowa’s Mercy Medical Center’s new Emergency Department constructed using Lean design
New Emergency Department features a "racetrack" design with a central nurses' station encircled by 19 private patient examination rooms and 2 trauma treatment rooms.
| Mar 21, 2012
Clary, Hendrickson named regional directors for HDR Architecture
New directors will be responsible for expanding and strengthening the firm throughout the central region.
| Mar 20, 2012
FMI releases 2012 first quarter construction outlook
The last time construction put in place was at this level was 2000-2001.