Inspired by the lagging productivity and efficiencies in the construction industry, Suffolk recently launched its most recent Smart Lab location, in Los Angeles.
Smart Labs were designed as a physical manifestation of the company’s “build smart” approach to planning and managing complex construction projects. They are equipped with interactive technologies such as a data wall, a huddlewall, a virtual reality CAVE (cave automatic virtual environment), and jobsite feeds. The data wall provides predictive analytics and operational performance indicators to measure critical areas of business, while the huddlewall facilitates Lean pull planning meetings and helps integrate 3D, 4D, and 5D models for maximum project efficiency.
See Also: The construction industry has a problem, and women are going to solve it
“Our Smart Lab in Los Angeles is on the front line of Suffolk’s industry revolution on the West Coast and will allow us to replicate our proven processes and add significant value for clients in this important, growing market,” said Chris Mayer, Chief Innovation Officer, Suffolk, in a release.
The Los Angeles Smart Lab joins Suffolk’s existing Smart Labs in San Francisco, New York City, Miami, Tampa, Dallas, and Boston.
Related Stories
| Dec 9, 2012
D’ambrosio joins BD+C’s editorial board
D’Ambrosio, a 2009 selection to the magazine’s “40 Under 40” galaxy of AEC superstars, holds a bachelor’s in architectural engineering from the Pennsylvania State University.
| Dec 9, 2012
AEC professionals cautiously optimistic about commercial construction in ’13
Most economists say the U.S. is slowly emerging from the Great Recession, a view that was confirmed to some extent by an exclusive survey of 498 BD+C subscribers whose views we sought on the commercial construction industry’s outlook on business prospects for 2013.
| Dec 6, 2012
Suffolk Construction awarded Phase Two of Boston’s Old Colony redevelopment project
Project team breaks ground on South Boston public housing project designed for energy efficiency.
| Dec 5, 2012
Gilbane publishes Winter 2012 construction economic report
Report outlines impact of recent events; predicts continued movement, while slow, toward recovery.
| Dec 5, 2012
Bernards selected to build new Merced, Calif. high school campus
Designed by BCA Architects, the $76 million, 220,000-ft project encompasses a total of nine buildings.
| Dec 5, 2012
McIntyre appointed Business Development Director for Shawmut’s Sports Venue Group
McIntyre will be tasked with expanding existing client relationships and creating new partnerships.
| Dec 4, 2012
MKK’s Denver Human Services Eastside Building wins ACEC Excellence Award
MKK provided mechanical, plumbing and fire protection consulting services on this LEED-NC Gold project.
| Dec 4, 2012
Thornton Tomasetti opens new office in São Paulo, Brazil
The move to São Paulo is strategic and timely, as the country continues preparations for the 2014 World Cup and 2016 Olympic Games in Rio de Janeiro.
| Dec 4, 2012
Greenhorne & O’Mara signs letter of intent to join Stantec
Acquisitions of C3TS and Architecture 2000 also completed.