Inspired by the lagging productivity and efficiencies in the construction industry, Suffolk recently launched its most recent Smart Lab location, in Los Angeles.
Smart Labs were designed as a physical manifestation of the company’s “build smart” approach to planning and managing complex construction projects. They are equipped with interactive technologies such as a data wall, a huddlewall, a virtual reality CAVE (cave automatic virtual environment), and jobsite feeds. The data wall provides predictive analytics and operational performance indicators to measure critical areas of business, while the huddlewall facilitates Lean pull planning meetings and helps integrate 3D, 4D, and 5D models for maximum project efficiency.
See Also: The construction industry has a problem, and women are going to solve it
“Our Smart Lab in Los Angeles is on the front line of Suffolk’s industry revolution on the West Coast and will allow us to replicate our proven processes and add significant value for clients in this important, growing market,” said Chris Mayer, Chief Innovation Officer, Suffolk, in a release.
The Los Angeles Smart Lab joins Suffolk’s existing Smart Labs in San Francisco, New York City, Miami, Tampa, Dallas, and Boston.
Related Stories
High-rise Construction | Mar 4, 2015
Must see: Egypt planning 656-foot pyramid skyscraper in Cairo
Zayed Crystal Spark Tower will stand 200 meters tall and will be just a short distance from the pyramids of Giza.
Office Buildings | Mar 3, 2015
Former DuPont lab to be converted into business incubator near UPenn campus
The new Pennovation Center will provide collaborative and research spaces for educators, scientists, students, and the private sector.
Sponsored | BIM and Information Technology | Mar 3, 2015
The great debate: Is 3D PDF really BIM?
You can pull apart buildings, cut through floors, and view simulated animation for assembly instructions all within a PDF.
Codes and Standards | Mar 2, 2015
Proposed energy standard for data centers, telecom buildings open for public comment
The intent of ASHRAE Standard 90.4P is to create a performance-based approach that would be more flexible and accommodating of innovative change.
Contractors | Mar 2, 2015
Nonresidential construction spending dips in January, still outpaced 2014
Nonresidential construction spending fell 2% in January, which is the largest setback to spending since January 2014, according to the March 2 release from the U.S. Census Bureau.
K-12 Schools | Mar 1, 2015
Are energy management systems too complex for school facility staffs?
When school districts demand the latest and greatest, they need to think about how those choices will impact the district’s facilities employees.
Industrial Facilities | Feb 27, 2015
Massive windmill will double as mixed-use entertainment tower in Rotterdam
The 571-foot structure will house apartments, a hotel, restaurants, even a roller coaster.
Office Buildings | Feb 26, 2015
Using active design techniques to strengthen the corporate workplace and enhance employee wellness
The new Lentz Public Health Center in Nashville, Tenn., serves as a model of how those progressive and healthy changes can be made.
K-12 Schools | Feb 26, 2015
Should your next school project include a safe room?
Many school districts continue to resist mandating the inclusion of safe rooms or storm shelters in new and existing buildings. But that may be changing.
K-12 Schools | Feb 26, 2015
Construction funding still scarce for many school districts
Many districts are struggling to have new construction and renovation keep pace with student population growth.