Inspired by the lagging productivity and efficiencies in the construction industry, Suffolk recently launched its most recent Smart Lab location, in Los Angeles.
Smart Labs were designed as a physical manifestation of the company’s “build smart” approach to planning and managing complex construction projects. They are equipped with interactive technologies such as a data wall, a huddlewall, a virtual reality CAVE (cave automatic virtual environment), and jobsite feeds. The data wall provides predictive analytics and operational performance indicators to measure critical areas of business, while the huddlewall facilitates Lean pull planning meetings and helps integrate 3D, 4D, and 5D models for maximum project efficiency.
See Also: The construction industry has a problem, and women are going to solve it
“Our Smart Lab in Los Angeles is on the front line of Suffolk’s industry revolution on the West Coast and will allow us to replicate our proven processes and add significant value for clients in this important, growing market,” said Chris Mayer, Chief Innovation Officer, Suffolk, in a release.
The Los Angeles Smart Lab joins Suffolk’s existing Smart Labs in San Francisco, New York City, Miami, Tampa, Dallas, and Boston.
Related Stories
Building Team Awards | Apr 10, 2015
Virtual collaboration helps complete a hospital in 24 months
PinnacleHealth needed a new hospital STAT! This team delivered it in two years, start to finish.
Building Team Awards | Apr 10, 2015
New arts venue reinvigorates Virginia Tech's campus
The STV-led Building Team creates a world-class performance and arts venue with learning and entrepreneurial dimensions.
Building Team Awards | Apr 9, 2015
Multifaced fitness center becomes campus landmark
A sloped running track and open-concept design put this Building Team to the test.
Building Team Awards | Apr 9, 2015
Nation's first LEED-certified bus depot
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.
Building Team Awards | Apr 9, 2015
Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.