flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Suffolk Construction selected as contractor for Boston luxury residential tower

Suffolk Construction selected as contractor for Boston luxury residential tower

Project team breaks ground on 488,000-sf building that will feature world-class amenities.


By By BD+C Staff | November 22, 2011
Suffolk Construction Kensington residential building Boston
The 27-story, 488,000-sf building will offer 381 luxury rental apartments, 2,300-sf of ground floor retail space, and 110 parkin

Suffolk Construction was recently awarded the construction contract for Boston’s newest residential tower, The Kensington, located at 659 Washington Street.

The 27-story, 488,000-sf building will offer 381 luxury rental apartments, 2,300-sf of ground floor retail space, and 110 parking spaces. Amenities will include fully equipped clubrooms, a sixth floor open air heated pool with a landscaped terrace, tech-savvy common areas, and a state-of-the-art fitness facility.

Suffolk recently broke ground on The Kensington, which will create 400 new jobs and bring long-awaited additional residential units to Boston’s Theater District neighborhood. It will be the latest Suffolk project built in the area, joining the Archstone Boston Common, Suffolk University Modern Theatre, and Boston Opera House. 

In addition to ground-floor retail space there will be an exhibit of artifacts from the Gaiety Theatre. The project has also provided funds to the nearby Hong Lok House to assist in the development of affordable housing for Chinatown seniors. In keeping with Boston Mayor Thomas M. Menino’s recent initiative to promote smoke-free living spaces in the city, The Kensington will be completely smoke-free. It will also be designed and built to achieve LEED Gold certification. BD+C

Related Stories

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 2, 2010

Historic changes to commercial building energy codes drive energy efficiency, emissions reductions

Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC)  represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021