flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Suffolk Construction selected as contractor for Boston luxury residential tower

Suffolk Construction selected as contractor for Boston luxury residential tower

Project team breaks ground on 488,000-sf building that will feature world-class amenities.


By By BD+C Staff | November 22, 2011
Suffolk Construction Kensington residential building Boston
The 27-story, 488,000-sf building will offer 381 luxury rental apartments, 2,300-sf of ground floor retail space, and 110 parkin

Suffolk Construction was recently awarded the construction contract for Boston’s newest residential tower, The Kensington, located at 659 Washington Street.

The 27-story, 488,000-sf building will offer 381 luxury rental apartments, 2,300-sf of ground floor retail space, and 110 parking spaces. Amenities will include fully equipped clubrooms, a sixth floor open air heated pool with a landscaped terrace, tech-savvy common areas, and a state-of-the-art fitness facility.

Suffolk recently broke ground on The Kensington, which will create 400 new jobs and bring long-awaited additional residential units to Boston’s Theater District neighborhood. It will be the latest Suffolk project built in the area, joining the Archstone Boston Common, Suffolk University Modern Theatre, and Boston Opera House. 

In addition to ground-floor retail space there will be an exhibit of artifacts from the Gaiety Theatre. The project has also provided funds to the nearby Hong Lok House to assist in the development of affordable housing for Chinatown seniors. In keeping with Boston Mayor Thomas M. Menino’s recent initiative to promote smoke-free living spaces in the city, The Kensington will be completely smoke-free. It will also be designed and built to achieve LEED Gold certification. BD+C

Related Stories

| May 29, 2012

Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos

McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 29, 2012

AIA expands Documents-On-Demand service??

Six new documents added, DOD offers nearly 100 contract documents.  

| May 29, 2012

Legrand achieves over 20% energy-intensity reduction in Presidential Challenge

West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 24, 2012

Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors

Anticipating increasing escalation in owner costs through 2014.

| May 24, 2012

Construction backlog declines 5.4% in the first quarter of 2012?

The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.

| May 24, 2012

Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion

The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.

boombox1
boombox2
native1

More In Category




Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021