Suffolk Construction will be launching a new comprehensive program designed to enhance the capabilities of Supplier Diversity Office (SDO)-certified businesses. The Suffolk Construction Subcontractor Development Series is a seven-session program that will assist subcontractors in cultivating long-term growth; strengthen the capacity of disadvantaged, minority, and women business enterprises; and foster relationships with Suffolk, the largest general contractor in New England. The unique program begins on September 13 and will be provided at no cost to thirty selected participants.
The Subcontractor Development Series will be a part of Suffolk’s award-winning Learning & Development program, which continues to set the industry standard for construction training initiatives. The series will be offered exclusively to fifteen union and fifteen non-union subcontractors that are certified by the Commonwealth of Massachusetts as a Disadvantaged Business Enterprise (DBE), Minority Business Enterprise (MBE), or Women Owned Business Enterprise (WBE). Firms must also have been in business for a minimum of two years.
Participants will obtain core construction management and business skills, ranging from risk management and financials to safety and scheduling. Each two-hour course will be presented in an interactive format and led by Suffolk personnel and local industry experts. Upon successful completion of the program, participants will receive a graduation certificate and have one-on-one access to Suffolk subject matter experts.
Classes will take place every Thursday from 6-8pm at Suffolk’s newly renovated, state-of-the-art Conference and Learning Center in Roxbury, Massachusetts. All eligible firms are encouraged to apply. The application deadline is August 10 at 5pm EDT, and selected participants will be notified by 5pm EDT on August 24. Space will be limited. For more information on the program and to apply, visit http://www.suffolkconstruction.com/subcontractor_development_series.html. +
Related Stories
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.