flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Suffolk Construction launches subcontractor development series

Suffolk Construction launches subcontractor development series

Professional certificate program to provide core construction management skills to disadvantaged, minority, and women business enterprises.


By Posted by Tim Gregorski, Senior Editor | July 19, 2012
This article first appeared in the August 2012 issue of BD+C.

Suffolk Construction will be launching a new comprehensive program designed to enhance the capabilities of Supplier Diversity Office (SDO)-certified businesses. The Suffolk Construction Subcontractor Development Series is a seven-session program that will assist subcontractors in cultivating long-term growth; strengthen the capacity of disadvantaged, minority, and women business enterprises; and foster relationships with Suffolk, the largest general contractor in New England. The unique program begins on September 13 and will be provided at no cost to thirty selected participants.

The Subcontractor Development Series will be a part of Suffolk’s award-winning Learning & Development program, which continues to set the industry standard for construction training initiatives. The series will be offered exclusively to fifteen union and fifteen non-union subcontractors that are certified by the Commonwealth of Massachusetts as a Disadvantaged Business Enterprise (DBE), Minority Business Enterprise (MBE), or Women Owned Business Enterprise (WBE). Firms must also have been in business for a minimum of two years.

Participants will obtain core construction management and business skills, ranging from risk management and financials to safety and scheduling. Each two-hour course will be presented in an interactive format and led by Suffolk personnel and local industry experts. Upon successful completion of the program, participants will receive a graduation certificate and have one-on-one access to Suffolk subject matter experts.

Classes will take place every Thursday from 6-8pm at Suffolk’s newly renovated, state-of-the-art Conference and Learning Center in Roxbury, Massachusetts. All eligible firms are encouraged to apply. The application deadline is August 10 at 5pm EDT, and selected participants will be notified by 5pm EDT on August 24. Space will be limited. For more information on the program and to apply, visit http://www.suffolkconstruction.com/subcontractor_development_series.html. +

Related Stories

K-12 Schools | Mar 2, 2015

BD+C special report: What it takes to build 21st-century schools

How the latest design, construction, and teaching concepts are being implemented in the next generation of America’s schools.

Codes and Standards | Mar 2, 2015

Proposed energy standard for data centers, telecom buildings open for public comment

The intent of ASHRAE Standard 90.4P is to create a performance-based approach that would be more flexible and accommodating of innovative change.

K-12 Schools | Mar 1, 2015

Are energy management systems too complex for school facility staffs?

When school districts demand the latest and greatest, they need to think about how those choices will impact the district’s facilities employees.

Office Buildings | Mar 1, 2015

Google unveils dramatic tent-like, modular-focused plan for corporate HQ

The master plan by Bjarke Ingels and Thomas Heatherwick will wrap highly flexible office blocks in soaring translucent canopies.

Industrial Facilities | Feb 27, 2015

Massive windmill will double as mixed-use entertainment tower in Rotterdam

The 571-foot structure will house apartments, a hotel, restaurants, even a roller coaster.

Architects | Feb 27, 2015

5 finalists announced for 2015 Mies van der Rohe Award

Bjarke Ingels' Danish Maritime Museum and the Ravensburg Art Museum by Lederer Ragnarsdóttir Oei are among the five projects vying for the award.

Office Buildings | Feb 26, 2015

Using active design techniques to strengthen the corporate workplace and enhance employee wellness

The new Lentz Public Health Center in Nashville, Tenn., serves as a model of how those progressive and healthy changes can be made.

K-12 Schools | Feb 26, 2015

Should your next school project include a safe room?

Many school districts continue to resist mandating the inclusion of safe rooms or storm shelters in new and existing buildings. But that may be changing.

K-12 Schools | Feb 26, 2015

Construction funding still scarce for many school districts

Many districts are struggling to have new construction and renovation keep pace with student population growth.

K-12 Schools | Feb 26, 2015

D.C.'s Dunbar High School is world's highest-scoring LEED school, earns 91% of base credits

The 280,000-sf school achieved 91 points, out of 100 base points possible for LEED, making it the highest-scoring school in the world certified under USGBC’s LEED for Schools-New Construction system.

boombox1
boombox2
native1

More In Category

Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021