Suffolk Construction recently joined state and local officials to celebrate the groundbreaking of The Victor, a 12-story, 377,000 sf residential tower consisting of 286 new apartments. Located at 95 Haverhill Street, at the northern end of the Rose F. Kennedy Greenway, the $92 million project will also include 17,000 sf of retail space and a three-story, above-grade parking garage with 138 spaces.
The Victor, which will be constructed over a portion of both an MBTA tunnel and the Thomas P. O’Neill I-93 tunnel, is expected to create 400 construction jobs, as well as additional jobs through its future retail tenants.
Building amenities will include two rooftop lounges, a 3,000 square-foot health club with a sports court and gaming lounge, and a residential lobby and lounge. It will also feature a variety of floor plans for residents, and be built according to LEED Silver standards.
The Victor mark’s Suffolk’s first time working with Simpson Housing LLLP, who will manage the building upon completion. ADD Inc is the architect. Construction is scheduled to be completed in early 2013. BD+C
Related Stories
Office Buildings | Oct 12, 2011
8 Must-know Trends in Office Fitouts
Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hello, bright, open offices with plenty of collaborative space.
| Oct 12, 2011
FMI’s Construction Outlook: Third Quarter 2011 Report
Construction Market Forecast: The general economy is seeing mixed signs.
| Oct 12, 2011
Bulley & Andrews celebrates 120 years of construction
The family-owned and operated general contractor attributes this significant milestone to the strong foundation built decades ago on honesty, integrity, and service in construction.
| Oct 12, 2011
Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health
Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by WBRC Architects , engineers in association with Perkins + Will
| Oct 11, 2011
AIA introduces five new documents for use on sustainable projects
These new documents will be available in the first quarter of 2012 as part of the new AIA Contract Documents service and AIA Documents on Demand.
| Oct 11, 2011
Pink light bulbs donated to Society of Memorial Sloan-Kettering Cancer Center
For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated to help support breast cancer research, education, screening, and treatment.
| Oct 11, 2011
ThyssenKrupp elevator cabs validated by UL Environment
The conclusive and independent third-party validation process is another step toward a green product line.
| Oct 11, 2011
Ballard Spahr launches real estate recovery group
The new group represents an expansion of the company’s Distressed Real Estate Initiative, which was launched in 2008 to help clients throughout the country plan, adapt and prosper in a challenging economic environment.
| Oct 11, 2011
Onex completes investment in JELD-WEN
With the completion of the JELD-WEN investment, Onex Partners III is approximately 40% invested.
| Oct 7, 2011
GREENBUILD 2011: Demand response partnership program announced at Greenbuild 2011
Program will use USGBC’s newly revised LEED Demand Response credit as an implementation guideline and leverage its relationships with the building community to foster adoption and participation in existing utility and solution provider demand response offerings.