flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Suffolk Construction awarded Phase Two of Boston’s Old Colony redevelopment project

Suffolk Construction awarded Phase Two of Boston’s Old Colony redevelopment project

Project team breaks ground on South Boston public housing project designed for energy efficiency.


By Posted by Tim Gregorski, Senior Editor | December 6, 2012
Old Colonys redevelopment is designed to include extensive green building and e
Old Colonys redevelopment is designed to include extensive green building and energy efficient measures and utilize low impact

Upon successfully completing Phase One, Suffolk Construction has been selected to manage construction on Phase Two of The Homes at Old Colony redevelopment project in South Boston.

The $50 million project will feature demolition of 223 distressed units and construction of 169 affordable rental units located in four three-story townhouse-style buildings and two four-level elevator buildings.

Suffolk recently joined developer Beacon Communities Development LLC, The Architectural Team, and government officials to celebrate the groundbreaking of Phase Two, which will be completed in May 2014. Prior to the redevelopment, the Old Colony public housing development was the most physically distressed property in the Boston Housing Authority’s portfolio. 

As a result, the BHA developed a master plan and successfully applied for and received $44 million in federal funding which allowed the multi-phase redevelopment effort to go forward.

Old Colony’s redevelopment is designed to include extensive green building and energy efficient measures and utilize low impact development strategies. In addition to the LEED Gold certified community building completed in Phase One, each townhome and midrise building is targeting LEED for Homes Platinum and the entire community is designed to achieve LEED certification for Neighborhood Development. 

Phase One featured demolition of 164 deteriorated units and construction of 116 new affordable housing units located in a midrise building and four clusters of wood frame townhouses. In addition, Suffolk built a 10,000-sf community center and maintenance garage, and managed improvements to roadways, parking areas, utility infrastructure, and landscaping. +

Related Stories

| Nov 11, 2012

Greenbuild 2012 Report: Higher Education

More and more colleges and universities see sustainainably designed buildings as a given

| Nov 11, 2012

Greenbuild 2012 Report: K-12

High-performance schools put ‘sustainability’ in the lesson plan

| Nov 11, 2012

Greenbuild 2012 Report

Enter the new era of ‘disclosure and transparency’

| Nov 7, 2012

John Portman & Associates awarded new high rise in China

108-story building to rise in Nanning, the Capital City of Guangxi Province.

| Nov 7, 2012

Two Thornton Tomasetti projects receive 2012 International Architecture Awards for Best Global Design

The awards, presented by the Chicago Athenaeum Museum of Architecture Design, the European Center for Architecture Art Design, and Urban Studies and Metropolitan Arts Press, Ltd., recognize excellence in architecture and urban planning.

| Nov 6, 2012

Honeywell donates first responder products for Hurricane Sandy relief and recovery efforts

Honeywell Humanitarian Relief Fund to provide aid to local employees affected by Hurricane Sandy.

| Nov 6, 2012

Uponor files patent infringement suit against Sioux Chief Manufacturing

Uponor is seeking damages and an injunction to prevent Sioux Chief from selling the PowerPEX F1960 Ring with Stop, which it believes violates Uponor’s patent.

| Nov 6, 2012

Simpson Strong-Tie donates $25K to hurricane support

The company will also be matching employees’ personal contributions to the Red Cross and other nonprofit disaster relief organizations.

| Nov 6, 2012

Goettsch Partners designs new tower in Shunde, China

200-meter-tall building will be located between Guangzhou and Hong Kong.

| Nov 5, 2012

Brasfield & Gorrie awarded new steel processing facility for Kloeckner Metals

The construction will take place on a 16-acre greenfield site at ThyssenKrupp Industrial Park in Calvert.

boombox1
boombox2
native1

More In Category

Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.



Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021