Suffolk Construction recently completed the multi-million dollar, state-of-the-art Advanced Multimodality Image Guided Operating (AMIGO) suite at Brigham and Women’s Hospital (BWH).
A highly integrated, 5,700 square-foot suite featuring three sterile procedure rooms, AMIGO represents the leading edge in surgical care, where image-guided surgical procedures will be introduced, tested, and perfected for the benefit of patients around the world.
The AMIGO suite will serve as the clinical arm and research test bed of the National Center for Image Guided Therapy (NCIGT) at Brigham and Women’s Hospital. Designed with new intraoperative technology, the suite features a Magnetic Resonance Imaging (MRI) room, an operating room with Angiography, and a Positron Emission Tomography (PET)/Computed Tomography (CT) room.Â
 Suffolk worked closely with Brigham and Women’s Hospital, architect Payette, and IMRIS, a global leader in image guided therapy solutions, to create a space that features a first-of-its-kind ceiling-mounted MRI that runs on rails between the MRI room and the operating room.  This design allows the equipment, rather than the patient, to move between rooms, resulting in reduced trauma for the patient as well as increased patient safety.
The suite also provides the intraoperative use of advanced imaging techniques that help make proceduresmore precise and enables surgeons to more fully assess the initial results before closing the incision and completing the procedure.  It is the first time that such a large variety of imaging technologies are situated together in one space in an operating suite. BD+C
Related Stories
| Dec 4, 2012
Thornton Tomasetti opens new office in SĂŁo Paulo, Brazil
The move to SĂŁo Paulo is strategic and timely, as the country continues preparations for the 2014 World Cup and 2016 Olympic Games in Rio de Janeiro.
| Dec 4, 2012
Greenhorne & O’Mara signs letter of intent to join Stantec
Acquisitions of C3TS and Architecture 2000 also completed.
| Dec 4, 2012
Sto Corp. announces new distributor in the Carolinas
Company will now have coverage in several parts of North Carolina.
| Dec 4, 2012
Wirtz Beverage Illinois’ corporate headquarters completed
WBI Center, a new state-of-the-art facility, is designed by Ware Malcomb.
| Dec 4, 2012
Wagner joins Ghafari as Manager of Structural Engineering
Wagner comes to Ghafari from Walter P Moore, where he served as a principal, chaired the construction administration task force and led the design of numerous projects ranging in size from $10 million to $70 million.
| Dec 4, 2012
City of Gainesville to break ground on $33 million bus fleet maintenance and ops facility
The 140,000-sf facility will include dispatch, administrative and maintenance facilities.
| Nov 28, 2012
Project team to showcase design for first mixed-use retail center of its kind in Mexico City
Project reaching construction milestone, offering national model for urban development in Mexico.
| Nov 28, 2012
Cummins announces ratings classification for data center power systems
The Data Center Continuous ratings span the range of Cummins Power Generation’s high horsepower diesel generator sets, from 1 MW up to 2.5 MW, and will apply to both 50 Hz and 60 Hz configurations.
| Nov 28, 2012
Francis Cauffman appoints Stainbrook Director of Higher Education
Stainbrook has 16 years of experience as a strategic planner and urban designer working on complex projects on- and off-campus.
| Nov 27, 2012
SFIA releases technical guide for cold-formed steel framing products
The 114-page book covers both structural and non-structural applications, including section properties of SFIA member product profiles, and complete load and span tables for most applications.