The national general contractor Suffolk has had a longstanding relationship with the University of Massachusetts. Over the years it has built nine residential facilities on that institution’s 9,000-student campus at North Dartmouth, Mass., between Providence and Cape Cod, including the 800-bed Pine Dale and Oak Glen halls, and the 1,200-bed Woodland apartment complex.
Last month, the partners broke ground on a $134 million housing and dining complex on Parking Lot 7 near the university’s Campus Center and College of Visual and Performing Arts.
The project, when completed in the fall of 2020, will replace four residence halls that opened in 1976. It includes a 1,210-bed, 267,000-sf housing complex in two buildings, with an estimated cost of $108 million. These facilities will have classrooms, multimedia and study lounges, demonstration kitchens, and recreational spaces. A technology equipped maker space will enable students to work in groups. The buildings will also have soundproof music practice rooms and two computer learning commons.
The housing builldings will flank a $26 million, 38,000-sf student dining commons with an 800-person capacity, which replaces the university’s main dining hall built in 1977. Its design includes a large flat top grill where students can see their meals being prepared.
“Our team has worked in collaboration with the University from the beginning and we are excited to deliver a facility that will meet the unique needs of their students and faculty for decades to come,” says Randy Kreie, Principal and President of DiMella Shaffer, the construction’s design architect.
The residence halls are being built through a private-public partnership between the university and Greystar, which specializes in housing development and management. No state taxpayer funds will be used, and the project won’t add to the university’s debt. (The project is being financed through the UMass Building Authority.)
This is the first major state-funded building project on this campus since 1980, and represents the first phase of Chancellor Robert E. Johnson’s plan to focus capital investment on the 710-acre UMass Dartmouth main campus. (As part of the current project’s overall scope, the campus’s Science and Engineering Building is undergoing a $54 million renovation that is partly financed by $25 million in state funds.) Future initiatives will include renovation and modernization of academic buildings, the campus center, road infrastructure, and athletic facilities.
“We know from studies and our own extensive experience that providing high-quality living-learning environments for students increases graduation rates, retention rates and academic performance,” says UMass President Marty Meehan. “This project represents an investment in student success and student opportunity at UMass Dartmouth, which by extension will benefit the SouthCoast and the entire Commonwealth.”
Related Stories
Smart Buildings | Jan 7, 2014
9 mega redevelopments poised to transform the urban landscape
Slowed by the recession—and often by protracted negotiations—some big redevelopment plans are now moving ahead. Here’s a sampling of nine major mixed-use projects throughout the country.
| Dec 13, 2013
Safe and sound: 10 solutions for fire and life safety
From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies.
| Dec 10, 2013
16 great solutions for architects, engineers, and contractors
From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.
| Nov 27, 2013
Wonder walls: 13 choices for the building envelope
BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina.
| Nov 26, 2013
Construction costs rise for 22nd straight month in November
Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.
| Nov 25, 2013
Building Teams need to help owners avoid 'operational stray'
"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.
| Nov 15, 2013
Greenbuild 2013 Report - BD+C Exclusive
The BD+C editorial team brings you this special report on the latest green building trends across nine key market sectors.
| Nov 15, 2013
Metal makes its mark on interior spaces
Beyond its long-standing role as a preferred material for a building’s structure and roof, metal is making its mark on interior spaces as well.
| Nov 13, 2013
Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study
The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.
| Oct 30, 2013
15 stellar historic preservation, adaptive reuse, and renovation projects
The winners of the 2013 Reconstruction Awards showcase the best work of distinguished Building Teams, encompassing historic preservation, adaptive reuse, and renovations and additions.