flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Success through teamwork for landmark California project

Sponsored Content Transit Facilities

Success through teamwork for landmark California project

The LEED Platinum-certified building provides service annually for 43 million passengers


By Viega | June 15, 2015
Anaheim Regional Transportation Intermodal Center

Anaheim Regional Transportation Intermodal Center

The Anaheim Regional Transportation Intermodal Center (ARTIC) is the Grand Central Station of the future. Centrally located in Orange County, California, ARTIC provides transportation service for three million local residents as well as 40 million annual visitors.

A LEED Platinum-certified building, the structure is 67,000 square feet with three levels, connecting people to a variety of transit options as well as entertainment, dining and retail locations.

“The ARTIC station is pretty monumental for the future,” said Paul Redgate, Pipe Fitting Superintendent for California Comfort Systems in San Diego. “It has multiple resources—a bus station, large parking facility for car pools. It’s the first of the high-speed rail stations that has been built today. The project itself was high profile for the city of Anaheim, much different than a typical install.”

ARTIC’s unique architecture includes a large number of windows and a dome-shaped structure, which results in high solar gains. Due to ARTIC’s unique architecture and size, controlling the climate inside the building with a conventional forced-air system would have been nearly impossible. Instead, HVAC designers for the project chose to implement a radiant heating and cooling system. Radiant cooling allows instantaneous removal of heat through absorption. Installing ViegaPEX™ Barrier tubing at tightly spaced increments (6 inches on-center) allows it to be within two inches of the finished surface floor, which gave the engineer the ability to immediately remove the solar sensible gain. For the ARTIC project, the cooling capacity ranges up to 40 btuh/sq. ft. This provides an energy savings of 34 percent over ASHRAE 90.1-2007.

“We installed 44,000 feet of in-slab heating and cooling pipe, 18 manifolds and 12 pumps,” Redgate said. “It was pretty large. This was our first radiant project of this size. We’ve done some smaller stuff but nothing on this scale.”

The ARTIC project marked California Comfort Systems’ first radiant heating and cooling project with Viega systems. It was also the first time the company worked hand-in-hand with Viega for the design of a project.

“From start to finish, from inception of the design to the commissioning, Viega was there by our side,” Redgate said. “Viega’s involvement was priceless; they didn’t just hand us the package and walk away. To have them out there all the way through to the end of the project was probably the best overall. And we still beat the industry average by 25 percent on the install.”

Viega offers radiant heating and cooling solutions that are easy to install. With simple connections and engineered system designs, Viega makes radiant heating and cooling projects easy, regardless of the project size. For more complicated, large-scale projects where the installers may not be totally confident, Viega offers training and assistance from start to finish.

“I can’t express enough how impressed I was with these guys who were paying attention to our project,” Redgate said. “Viega has a great team of people that are very passionate about their product.”

For more information, visit www.viega.us.

Related Stories

Smart Buildings | Jan 7, 2014

9 mega redevelopments poised to transform the urban landscape

Slowed by the recession—and often by protracted negotiations—some big redevelopment plans are now moving ahead. Here’s a sampling of nine major mixed-use projects throughout the country. 

| Jan 6, 2014

What is value engineering?

If you had to define value engineering in a single word, you might boil it down to "efficiency." That would be one word, but it wouldn’t be accurate.

| Jan 3, 2014

Norman Foster proposes elevated bikeways throughout London

Called SkyCycle, the plan calls for the construction of wide, car-free decks atop the city's existing railway corridors.

| Dec 13, 2013

Safe and sound: 10 solutions for fire and life safety

From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies. 

| Dec 10, 2013

16 great solutions for architects, engineers, and contractors

From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

| Nov 26, 2013

Construction costs rise for 22nd straight month in November

Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.

| Nov 25, 2013

Building Teams need to help owners avoid 'operational stray'

"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.

| Oct 30, 2013

11 hot BIM/VDC topics for 2013

If you like to geek out on building information modeling and virtual design and construction, you should enjoy this overview of the top BIM/VDC topics.

| Oct 18, 2013

Researchers discover tension-fusing properties of metal

When a group of MIT researchers recently discovered that stress can cause metal alloy to fuse rather than break apart, they assumed it must be a mistake. It wasn't. The surprising finding could lead to self-healing materials that repair early damage before it has a chance to spread. 

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



Transit Facilities

Top 25 Transit Facility Construction Firms for 2023

The Walsh Group, Clark Group, Hensel Phelps, Skanska USA, and Hill International top BD+C's ranking of the nation's largest transit facility general contractors and construction management (CM) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes construction revenue for work related to bus terminals, rail terminals, and transit stations.


Transit Facilities

Top 40 Transit Facility Engineering Firms for 2023

AECOM, Jacobs, EXP, WSP, and Arup head BD+C's ranking of the nation's largest transit facility engineering and engineering/architecture (EA) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to bus terminals, rail terminals, and transit stations.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021