flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Studio Libeskind designs jagged mixed-use tower for Lithuania’s capital

Mixed-Use

Studio Libeskind designs jagged mixed-use tower for Lithuania’s capital

The glass facade, and spaces for restaurants, a luxury hotel, and offices will lure visitors and tenants.


By Mike Chamernik, Associate Editor | July 18, 2016

Downtown Tower-K18B. Rendering courtesy Studio Libeskind. Click here to enlarge.

Daniel Libeskind's firm, Studio Libeskind, designed an angular 18-story tower atop a six-story podium for Vilnius, the capital city of Lithuania.

Named Downtown Tower-K18B because of its location on Konstitucijos Avenue 18B, the 20,000-sm building will have a “luminous” glass facade, according to designers.

“The geometry creates a unique expression enriching the city skyline and improving its multi-dimensionality,” as Studio Libeskind wrote. “The bold, sculptural design of this multi-faceted glass tower reflects the light, sky and surroundings with a play of transparent and opaque surfaces.”

Upper floors will contain offices and an upscale hotel, and the ground floors will have restaurant, bar and retail space, along with hotel and office lobbies. The building will be situated in the heart of the business district in downtown Vilnius. 

Both ArchDaily and designboom report that Studio Libeskind won an international competition to design the building. 

Last year, the firm released plans for a Lithuanian modern art museum, also in Vilnius.

Downtown Tower-K18B is still in the design phase.

Tags

Related Stories

Mixed-Use | Jan 2, 2018

Food incubator will support entrepreneurs on Chicago’s West Side

Designed by Wight & Company, the 67,000-sf food incubator development in Chicago’s East Garfield Park neighborhood will also serve as the new headquarters for the nonprofit Accion Chicago.

Mixed-Use | Dec 12, 2017

A new live/work neighborhood is about to get under way in Omaha, Neb.

Walkability and recreation will be key features of West Farm.

Mixed-Use | Dec 12, 2017

Construction begins on Phase I of $240 million mixed-use development in Boston

Fenway Center will span 4.5 acres between Brookline, Beacon Street, David Ortiz Way, and the Massachusetts Turnpike.

Mixed-Use | Nov 17, 2017

Riverton will be the largest mixed-use project in New Jersey history

The 418-acre waterfront development will sit on the Raritan River.

Mixed-Use | Nov 1, 2017

18-story residential tower breaks ground near Temple University

The tower will provide apartment units for students and young professionals.

Mixed-Use | Oct 19, 2017

Mixed-use Dubai tower will have the world’s tallest ceramic facade

The 63-story tower will house a Mandarin Oriental hotel, residences, and restaurants.

Mixed-Use | Oct 6, 2017

Omaha gets its first entertainment district

Leo A Daly designed the mixed-use development, which takes advantage of a new city ordinance that allows alcoholic beverages outdoors.

High-rise Construction | Oct 4, 2017

90-story mixed-use building could become Denver’s first supertall tower

Manhattan-based Greenwich Realty Capital is developing the project.

Reconstruction & Renovation | Sep 28, 2017

Plans for Chicago’s historic Post Office building revealed by 601W Companies and Gensler

The redevelopment project is currently the largest in the nation.

Mixed-Use | Sep 26, 2017

Perkins+Will designs new international business community in Cali, Colombia

The new free trade zone is designed to resemble a small village.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021