flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground

Performing Arts Centers

Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground

The venue accommodates open-air productions against backdrop of Hudson River


By Peter Fabris, Contributing Editor | October 10, 2024
Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground. Rendering courtesy Studio Gang
Rendering courtesy Studio Gang

A new permanent home for Hudson Valley Shakespeare, a professional non-profit theater company, recently broke ground in Garrison, N.Y. The Samuel H. Scripps Theater Center includes a 14,850 sf performance venue that will serve as a permanent home for the theater company known for its sweeping open-air productions of classics and new works. The theater, located 80 minutes north of Manhattan, is set against the backdrop of the Hudson River and the surrounding landscape of a 98-acre campus.

The structure will be the first public purpose-built LEED Platinum theater in the United States and is the centerpiece of a design with extensive green space and rewilding across the campus, a former golf course. Designed by Studio Gang, the facility will be a singular theatrical destination for New York and the wider performing arts community and a cultural anchor for Hudson Valley, while providing the company with greater versatility for actors, audiences, and back-of-house operations. It will extend the viable performance season into the fall.

The theater’s curved, timber-framed grid shell and timber columns emerge from the landscape to create a dialogue with the Hudson Highlands. The stage’s proscenium arch is oriented to frame picturesque views of the Wey-Gat (Dutch for “Wind Gate”) of Storm King Mountain, the Hudson River, and Breakneck Ridge, and allows actors to use the existing topography to emerge from the landscape. Anchored by an open-air theater, the program is spread across several pavilions that include a back-of-house facility, a concession building, and public restrooms.

Each pavilion is clad in natural materials evoking the minerality of the region. Outdoor gathering spaces adjacent to the theater encourage visitors to connect with each other in an extraordinary natural setting, while a nearby overlook offers an intimate space for pre- and post-performance programming.

The landscape design rehabilitates the former golf course to restore native grasses and wetlands supporting biodiversity and decreased resource use. Nearly 14 acres of new plantings will include 250 native or adaptive trees, native grasses, forbs, and perennials, and bioretention areas that collect and filter stormwater runoff. The landscape is designed as an experiential sequence. Upon arrival to a gravel parking area, visitors encounter a mix of unpaved and accessible paths that guide them up and through native meadows, immersing them in nature and providing views out to the Wind Gate, and ultimately leading to the hilltop theater and gathering areas.

Much of the site was left open for future walking trails or other community uses, while 25,000 sf of picnic lawns, shaded by new native trees, offer an abundance of vantage points to take in the view and enjoy pre-show programming. The design employs several features to enhance environmental performance, including natural ventilation and brise soleil systems, low embodied carbon structure and cladding, and rooftop solar panels.

Project Team
Owner and/or developer: Hudson Valley Shakespeare
Design architect: Studio Gang
Architect of record: Studio Gang
MEP engineer: Buro Happold
Structural engineer: Thornton Tomasetti
General contractor/construction manager: Consigli Construction

Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground. Rendering courtesy Studio Gang
Rendering courtesy Studio Gang
Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground. Rendering courtesy Studio Gang
Rendering courtesy Studio Gang
Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground. Rendering courtesy Studio Gang
Site plan courtesy Studio Gang
Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground. Rendering courtesy Studio Gang
Rendering courtesy Studio Gang
Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground. Rendering courtesy Studio Gang
Rendering courtesy Studio Gang

Related Stories

Resiliency | Aug 19, 2021

White paper outlines cost-effective flood protection approaches for building owners

A new white paper from Walter P Moore offers an in-depth review of the flood protection process and proven approaches.

Resiliency | Jun 24, 2021

Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]

New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

Performing Arts Centers | Feb 23, 2021

The Buddy Holly Hall of Performing Arts and Sciences opens

Diamond Schmitt designed the project, which is named for Lubbock native Buddy Holly.

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

Giants 400 | Dec 3, 2020

2020 Cultural Facilities Giants: Top architecture, engineering, and construction firms in the U.S. cultural facilities sector

AECOM, Arup, and Populous head BD+C's rankings of the nation's largest cultural facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

AEC Tech | Nov 12, 2020

The Weekly show: Nvidia's Omniverse, AI for construction scheduling, COVID-19 signage

BD+C editors speak with experts from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot on the November 12 episode of "The Weekly." The episode is available for viewing on demand.

Performing Arts Centers | Aug 31, 2020

Reopening campus performance arts centers

Live productions, which offer students the opportunity to hone their skills with true audience feedback, currently pose health risks for students and faculty.

boombox1
boombox2
native1

More In Category



Performing Arts Centers

Frank Gehry-designed expansion of the Colburn School performing arts center set to break ground

In April, the Colburn School, an institute for music and dance education and performance, will break ground on a 100,000-sf expansion designed by architect Frank Gehry. Located in downtown Los Angeles, the performing arts center will join the neighboring Walt Disney Concert Hall and The Grand by Gehry, forming the largest concentration of Gehry-designed buildings in the world.


Giants 400

Top 35 Performing Arts Center and Concert Venue Construction Firms for 2023

The Whiting-Turner Contracting Company, Holder Construction, McCarthy Holdings, Clark Group, and Gilbane Building Company top BD+C's ranking of the nation's largest performing arts center and concert venue general contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021