flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground

Performing Arts Centers

Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground

The venue accommodates open-air productions against backdrop of Hudson River


By Peter Fabris, Contributing Editor | October 10, 2024
Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground. Rendering courtesy Studio Gang
Rendering courtesy Studio Gang

A new permanent home for Hudson Valley Shakespeare, a professional non-profit theater company, recently broke ground in Garrison, N.Y. The Samuel H. Scripps Theater Center includes a 14,850 sf performance venue that will serve as a permanent home for the theater company known for its sweeping open-air productions of classics and new works. The theater, located 80 minutes north of Manhattan, is set against the backdrop of the Hudson River and the surrounding landscape of a 98-acre campus.

The structure will be the first public purpose-built LEED Platinum theater in the United States and is the centerpiece of a design with extensive green space and rewilding across the campus, a former golf course. Designed by Studio Gang, the facility will be a singular theatrical destination for New York and the wider performing arts community and a cultural anchor for Hudson Valley, while providing the company with greater versatility for actors, audiences, and back-of-house operations. It will extend the viable performance season into the fall.

The theater’s curved, timber-framed grid shell and timber columns emerge from the landscape to create a dialogue with the Hudson Highlands. The stage’s proscenium arch is oriented to frame picturesque views of the Wey-Gat (Dutch for “Wind Gate”) of Storm King Mountain, the Hudson River, and Breakneck Ridge, and allows actors to use the existing topography to emerge from the landscape. Anchored by an open-air theater, the program is spread across several pavilions that include a back-of-house facility, a concession building, and public restrooms.

Each pavilion is clad in natural materials evoking the minerality of the region. Outdoor gathering spaces adjacent to the theater encourage visitors to connect with each other in an extraordinary natural setting, while a nearby overlook offers an intimate space for pre- and post-performance programming.

The landscape design rehabilitates the former golf course to restore native grasses and wetlands supporting biodiversity and decreased resource use. Nearly 14 acres of new plantings will include 250 native or adaptive trees, native grasses, forbs, and perennials, and bioretention areas that collect and filter stormwater runoff. The landscape is designed as an experiential sequence. Upon arrival to a gravel parking area, visitors encounter a mix of unpaved and accessible paths that guide them up and through native meadows, immersing them in nature and providing views out to the Wind Gate, and ultimately leading to the hilltop theater and gathering areas.

Much of the site was left open for future walking trails or other community uses, while 25,000 sf of picnic lawns, shaded by new native trees, offer an abundance of vantage points to take in the view and enjoy pre-show programming. The design employs several features to enhance environmental performance, including natural ventilation and brise soleil systems, low embodied carbon structure and cladding, and rooftop solar panels.

Project Team
Owner and/or developer: Hudson Valley Shakespeare
Design architect: Studio Gang
Architect of record: Studio Gang
MEP engineer: Buro Happold
Structural engineer: Thornton Tomasetti
General contractor/construction manager: Consigli Construction

Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground. Rendering courtesy Studio Gang
Rendering courtesy Studio Gang
Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground. Rendering courtesy Studio Gang
Rendering courtesy Studio Gang
Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground. Rendering courtesy Studio Gang
Site plan courtesy Studio Gang
Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground. Rendering courtesy Studio Gang
Rendering courtesy Studio Gang
Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground. Rendering courtesy Studio Gang
Rendering courtesy Studio Gang

Related Stories

| Jan 13, 2014

Custom exterior fabricator A. Zahner unveils free façade design software for architects

The web-based tool uses the company's factory floor like "a massive rapid prototype machine,” allowing designers to manipulate designs on the fly based on cost and other factors, according to CEO/President Bill Zahner.

| Jan 11, 2014

Getting to net-zero energy with brick masonry construction [AIA course]

When targeting net-zero energy performance, AEC professionals are advised to tackle energy demand first. This AIA course covers brick masonry's role in reducing energy consumption in buildings. 

Smart Buildings | Jan 7, 2014

9 mega redevelopments poised to transform the urban landscape

Slowed by the recession—and often by protracted negotiations—some big redevelopment plans are now moving ahead. Here’s a sampling of nine major mixed-use projects throughout the country. 

| Dec 30, 2013

Calatrava facing legal action from his home town over crumbling cultural complex

Officials with the city of Valencia, Spain, are blaming Santiago Calatrava for the rapid deterioration of buildings within its City of Arts and Sciences complex.

| Dec 13, 2013

Safe and sound: 10 solutions for fire and life safety

From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies. 

| Dec 10, 2013

16 great solutions for architects, engineers, and contractors

From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.

| Dec 4, 2013

First look: Dubai's winning bid for World Expo 2020 [slideshow]

Dubai has been chosen as the site of the 2020 World Expo. HOK led the design team that developed the master plan for the Expo, which is expected to draw more than 25 million visitors from October 2020 through April 2021.

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

| Nov 26, 2013

Construction costs rise for 22nd straight month in November

Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.

| Nov 25, 2013

Building Teams need to help owners avoid 'operational stray'

"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.

boombox1
boombox2
native1

More In Category



Performing Arts Centers

Frank Gehry-designed expansion of the Colburn School performing arts center set to break ground

In April, the Colburn School, an institute for music and dance education and performance, will break ground on a 100,000-sf expansion designed by architect Frank Gehry. Located in downtown Los Angeles, the performing arts center will join the neighboring Walt Disney Concert Hall and The Grand by Gehry, forming the largest concentration of Gehry-designed buildings in the world.


Giants 400

Top 35 Performing Arts Center and Concert Venue Construction Firms for 2023

The Whiting-Turner Contracting Company, Holder Construction, McCarthy Holdings, Clark Group, and Gilbane Building Company top BD+C's ranking of the nation's largest performing arts center and concert venue general contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021