flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Studio Gang tapped for American Museum of Natural History expansion

Studio Gang tapped for American Museum of Natural History expansion

The opening of the new space is is set to coincide with the museum's 150th anniversary in 2019-2020. 


By BD+C Staff | December 15, 2014

Chicago-based Studio Gang Architects has been commissioned to design the new Gilder Center for Science, Education and Innovation at the American Museum of Natural History in New York. The $325 million project will include 218,000 sf of new and existing space, ArchDaily reports.

“I was immediately struck by the immense range of work the museum is already doing as an educational facility to reach learners of all ages,” said Jeanne Gang, Founder and Design Principal of Studio Gang. “This project and collaboration with the Museum is incredibly important to me and my entire team. The Gilder Center’s holistic mission closely aligns with Studio Gang’s interdisciplinary practice of integrating architecture, nature, science, and art. Designing spaces that facilitate interaction between science, education, and exhibition experiences will make possible the learning the new Gilder Center aspires to generate.”

The opening of the new space is set to coincide with the museum's 150th anniversary in 2019-2020. Ralph Appelbaum of Ralph Appelbaum Associates, Designer of the museum's exhibits in the Rose Center for Earth and Space, the fourth-floor fossil halls, and the Hall of Biodiversity, will design the exhibitions for the Gilder Center. 

Related Stories

| Oct 14, 2011

University of New Mexico Science & Math Learning Center attains LEED for Schools Gold

Van H. Gilbert architects enhances sustainability credentials.

| Oct 14, 2011

BD+C Survey on Building Information Modeling: The Good, the Bad, and the Solutions

In a recent survey conducted by Building Design+Construction, more than 75% of respondents indicated they currently use BIM or plan to use it. Respondents were also asked to comment on their experiences with BIM, what they liked and disliked about BIM, and what BIM-related advice they would give to their peers. 

| Oct 14, 2011

ACI partners with CRSI to launch new adhesive anchor certification program

Adhesive anchor installer certification required in new ACI 318-11.

| Oct 14, 2011

Midwest construction firms merge as Black and Dew

  Merger is aimed at increasing market sector capabilities and building on communication and core contracting competencies.

| Oct 14, 2011

AIA Continuing Education: optimizing moisture protection and air barrier systems

Earn 1.0 AIA/CES learning units by studying this article and passing the online exam.

| Oct 12, 2011

BIM Clarification and Codification in a Louisiana Sports Museum

The Louisiana State Sports Hall of Fame celebrates the sporting past, but it took innovative 3D planning and coordination of the future to deliver its contemporary design.

| Oct 12, 2011

Vertical Transportation Systems Reach New Heights

Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently. 

| Oct 12, 2011

Building a Double Wall

An aged federal building gets wrapped in a new double wall glass skin.

Office Buildings | Oct 12, 2011

8 Must-know Trends in Office Fitouts

Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hello, bright, open offices with plenty of collaborative space.

| Oct 12, 2011

FMI’s Construction Outlook: Third Quarter 2011 Report

  Construction Market Forecast: The general economy is seeing mixed signs.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021