flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Studio Gang designs agricultural education center for the New York City Housing Authority

Education Facilities

Studio Gang designs agricultural education center for the New York City Housing Authority

The $18.2 million Marlboro Agricultural Education Center will feature a working rooftop greenhouse that will serve as a learning lab.


By Novid Parsi, Contributing Editor | June 6, 2024
Studio Gang designs agricultural education center for the New York City Housing Authority. Rendering courtesy Studio Gang
Rendering courtesy Studio Gang

Earlier this month, the City of New York broke ground on the new $18.2 million Marlboro Agricultural Education Center (MAEC) at the New York City Housing Authority’s Marlboro Houses in Brooklyn. 

In line with the mission of its nonprofit operator, The Campaign Against Hunger, MAEC aims to strengthen food autonomy and security in underserved neighborhoods. MAEC will provide Marlboro Houses with diverse, community-oriented programs.

Designed by the Studio Gang and built by Consigli Construction Co., the 9,900-sf center will feature a rooftop greenhouse for raising plants and fish. The second-floor greenhouse will serve as a learning lab for schoolchildren and visitors and will help young adults engage with local, sustainable food production. On the ground floor, flexible teaching and community spaces will offer cooking and nutrition classes, among other programs. In the winter, MAEC will host an indoor market.

The building’s large windows and generous sidewalk frontage aim to strengthen connections with the surrounding neighborhood. Entrances on multiple sides create physical and visual connections to the street and surrounding area. A small public terrace and planter garden will encourage visitors to stop by.

Located in a coastal flood zone, the building will be elevated, which also will create opportunities for street furniture. The sustainable design includes passive heating and cooling, solar access, all-electric systems, and rainwater storage and reuse. The project, which targets LEED Gold certification, will use materials with minimal maintenance for a lifecycle of over 60 years. 

The MAEC project leverages a design-build project delivery method to remove lengthy contracting from the traditional delivery method that historically has been used for city capital projects, according to the City of New York’s press release. The design-build method also will shorten timelines and increase participation by minority- and women-owned businesses.

On the Building Team:
Project operator: The Campaign Against Hunger 
Design architect: Studio Gang
Design-build contractor: Consigli Construction Co. 
Landscape architect: Eponymous Practice
Structural engineer: Thornton Tomasetti 
Civil engineer: Philip Habib & Associates
Geotechnical engineer: Langan 
MEPFP: BALA Consulting Engineers
Greenhouse enclosure design: Prospiant

Rendering courtesy Studio Gang
Rendering courtesy Studio Gang 
Rendering courtesy Studio Gang
Rendering courtesy Studio Gang 
Rendering courtesy Studio Gang
Rendering courtesy Studio Gang 
Rendering courtesy Studio Gang
Rendering courtesy Studio Gang 

Related Stories

Education Facilities | Jan 29, 2018

My day as a kindergartner

The idea of a kindergarten-only school presents both challenges and opportunities in regards to the design.

K-12 Schools | Jan 24, 2018

Hawaii’s first net-zero public school

G70 is the architect, planner, and civil engineer of record for the project.

University Buildings | Jan 19, 2018

A 360-degree classroom highlights Washington State University’s new academic innovation hub

The circle-in-the-round classroom can accommodate 275 students.

Education Facilities | Jan 9, 2018

Elementary school, daycare campus will serve Toronto's skyrise neighborhood

While the district’s vertical living lifestyle is geared for young singles and empty nesters, CityPlace has attracted a surprising number of families.

Education Facilities | Jan 8, 2018

Three former school buildings are repurposed to create mini-campus for teacher education

The $25.3 million project is currently under construction on the Winona State University campus.

Healthcare Facilities | Jan 6, 2018

A new precision dental center embodies Columbia University’s latest direction for oral medicine education

The facility, which nests at “the core” of the university’s Medical Center, relies heavily on technology and big data. 

Education Facilities | Jan 2, 2018

New Bancroft Campus responds to the challenges of autism through design

The 80-acre campus is located in Mount Laurel, N.J.

boombox1
boombox2
native1

More In Category


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021