Star Wars director George Lucas selected Chicago-based Studio Gang Architects and Beijing firm MAD to design his proposed art museum on Chicago’s lakefront, DeZeen reports.
The Lucas Museum of Narrative Art (LMNA) will house the director’s collections, ranging from illustrations to film to digital media.
According to a press release from the museum, MAD was selected as principal designer for the LMNA while Studio Gang will design the landscape and create a landscaped bridge between the museum and Northerly Island, the 91-acre man-made peninsula that houses part of Chicago’s Museum Campus.
From the press release:
Ma Yansong, the founder of MAD Architects, will be responsible for the design and overall concept of the LMNA building. In seeking to connect the interior and exterior worlds, Mr. Ma has designed some of the most innovative buildings in the world including Absolute Towers in Ontario, Canada, the Ordos Museum in Ordos, China and Chaoyang Park Plaza in Beijing, China.
“It is a gift to be able to design the Lucas Museum of Narrative Art in a city so rich with architectural history,” said Mr. Ma, a graduate of the Yale School of Architecture. “I am humbled and honored to be given this opportunity to create a timeless design that moves and inspires people just like Mr. Lucas’ collection.”
To connect the LMNA to neighboring Northerly Island, a bridge will be built by the LMNA, at no cost to the City of Chicago. Jeanne Gang, who has spent the past four years transforming Northerly Island from an airport runway to an oasis of greenery, will design the bridge and lead the landscape design for the LMNA.
“We are excited to build upon our current work and collaborate to create a seamless transition between the Museum Campus and Northerly Island,” said Ms. Gang, a MacArthur Fellow. “In keeping with the Northerly Island ethos, our design goal will be to create a combined ecological and urban habitat.”
Related Stories
| Dec 5, 2011
New York and San Francisco receive World Green Building Council's Government Leadership Awards
USGBC commends two U.S. cities for their innovation in green building leadership.
| Dec 5, 2011
Summit Design+Build begins renovation of Chicago’s Esquire Theatre
The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.
| Dec 5, 2011
Fraser Brown MacKenna wins Green Gown Award
Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.
| Dec 5, 2011
RJM Construction begins building Nova Classical Academy in St. Paul
As the general contractor, RJM is constructing the 94,000-sf building that will consolidate the St. Paul school’s two other locations.
| Dec 5, 2011
Gables Residential brings mixed-use building to Houston's Tanglewood area
The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.
| Dec 5, 2011
SchenkelShultz Architecture designs Dr. Phillips Charities Headquarters building in Orlando
The building incorporates sustainable architectural features, environmentally friendly building products, energy-efficient systems, and environmentally-sensitive construction practices.
| Dec 2, 2011
What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20
Nominate a colleague, peer, or even yourself. Applications available here.
| Dec 2, 2011
Legrand joins White House initiative to spur energy efficiency in commercial buildings
Company agrees to aggressive energy savings and reporting.
| Dec 2, 2011
Goody Clancy awarded Ohio State residential project
The project, which is focused on developing a vibrant on-campus community of learning for OSU undergraduates.
| Dec 1, 2011
Nauset Construction breaks ground on Massachusetts health care center
The $20 million project is scheduled to be completed by December 2012.