Star Wars director George Lucas selected Chicago-based Studio Gang Architects and Beijing firm MAD to design his proposed art museum on Chicago’s lakefront, DeZeen reports.
The Lucas Museum of Narrative Art (LMNA) will house the director’s collections, ranging from illustrations to film to digital media.
According to a press release from the museum, MAD was selected as principal designer for the LMNA while Studio Gang will design the landscape and create a landscaped bridge between the museum and Northerly Island, the 91-acre man-made peninsula that houses part of Chicago’s Museum Campus.
From the press release:
Ma Yansong, the founder of MAD Architects, will be responsible for the design and overall concept of the LMNA building. In seeking to connect the interior and exterior worlds, Mr. Ma has designed some of the most innovative buildings in the world including Absolute Towers in Ontario, Canada, the Ordos Museum in Ordos, China and Chaoyang Park Plaza in Beijing, China.
“It is a gift to be able to design the Lucas Museum of Narrative Art in a city so rich with architectural history,” said Mr. Ma, a graduate of the Yale School of Architecture. “I am humbled and honored to be given this opportunity to create a timeless design that moves and inspires people just like Mr. Lucas’ collection.”
To connect the LMNA to neighboring Northerly Island, a bridge will be built by the LMNA, at no cost to the City of Chicago. Jeanne Gang, who has spent the past four years transforming Northerly Island from an airport runway to an oasis of greenery, will design the bridge and lead the landscape design for the LMNA.
“We are excited to build upon our current work and collaborate to create a seamless transition between the Museum Campus and Northerly Island,” said Ms. Gang, a MacArthur Fellow. “In keeping with the Northerly Island ethos, our design goal will be to create a combined ecological and urban habitat.”
Related Stories
| Feb 2, 2012
Mortenson Construction to build 2.4 MW solar project in North Carolina
Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.
| Feb 2, 2012
Shawmut Design and Construction launches sports venues division
Expansion caps year of growth for Shawmut.
| Feb 2, 2012
Fire rated glazing helps historic university preserve its past
When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.
| Feb 2, 2012
Delk joins Gilbane Building Co.
Delk to focus on healthcare construction programs and highly complex higher education facilities for Gilbane Building Company’s Southwest region.
| Feb 2, 2012
Next phase of construction begins on Scripps Prebys Cardiovascular Institute
$456 million Institute will be comprehensive heart center for 21st Century.
| Feb 1, 2012
Increase notched in construction jobs, but unemployment rate still at 16%
AGC officials said that construction employment likely benefited from unseasonably warm weather across much of the country that extended the building season.
| Feb 1, 2012
Replacement windows eliminate weak link in the building envelope
Replacement or retrofit can help keep energy costs from going out the window.
| Feb 1, 2012
‘Augmented reality’ comes to the job site
A new software tool derived from virtual reality is helping Building Teams use the power of BIM models more effectively.
| Feb 1, 2012
New ways to work with wood
New products like cross-laminated timber are spurring interest in wood as a structural material.
| Feb 1, 2012
Blackney Hayes designs school for students with learning differences
The 63,500 sf building allows AIM to consolidate its previous two locations under one roof, with room to expand in the future.