flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Studio Gang Architects, MAD to design George Lucas' museum in Chicago

Studio Gang Architects, MAD to design George Lucas' museum in Chicago

The lakefront museum will have a landscaped bridge connecting it to Northerly Island.


By BD+C Staff | July 29, 2014

Star Wars director George Lucas selected Chicago-based Studio Gang Architects and Beijing firm MAD to design his proposed art museum on Chicago’s lakefront, DeZeen reports.

The Lucas Museum of Narrative Art (LMNA) will house the director’s collections, ranging from illustrations to film to digital media.

According to a press release from the museum, MAD was selected as principal designer for the LMNA while Studio Gang will design the landscape and create a landscaped bridge between the museum and Northerly Island, the 91-acre man-made peninsula that houses part of Chicago’s Museum Campus.

From the press release:

Ma Yansong, the founder of MAD Architects, will be responsible for the design and overall concept of the LMNA building. In seeking to connect the interior and exterior worlds, Mr. Ma has designed some of the most innovative buildings in the world including Absolute Towers in Ontario, Canada, the Ordos Museum in Ordos, China and Chaoyang Park Plaza in Beijing, China.

“It is a gift to be able to design the Lucas Museum of Narrative Art in a city so rich with architectural history,” said Mr. Ma, a graduate of the Yale School of Architecture. “I am humbled and honored to be given this opportunity to create a timeless design that moves and inspires people just like Mr. Lucas’ collection.”

To connect the LMNA to neighboring Northerly Island, a bridge will be built by the LMNA, at no cost to the City of Chicago. Jeanne Gang, who has spent the past four years transforming Northerly Island from an airport runway to an oasis of greenery, will design the bridge and lead the landscape design for the LMNA.

“We are excited to build upon our current work and collaborate to create a seamless transition between the Museum Campus and Northerly Island,” said Ms. Gang, a MacArthur Fellow. “In keeping with the Northerly Island ethos, our design goal will be to create a combined ecological and urban habitat.”

Related Stories

| Mar 7, 2012

Turner appointed Batson-Cook CFO and treasurer

Cecil G. Hood to continue in advisory role.

| Mar 7, 2012

Thornton Tomasetti names Dowdall VP of Kansas City office

Dowdall will be responsible for supporting the Property Loss Consulting, Building Performance and Building Sustainability practices nationally.

| Mar 7, 2012

LEO A DALY selected to design Minnesota Fallen Firefighters Memorial

The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.

| Mar 7, 2012

Houlihan Lokey adds Steffen to Industrials Group

Steffen bolsters group with experience in the building materials and rorest product sectors.

| Mar 6, 2012

Country’s first Green House home for veterans completed

Residences at VA Danville to provide community-centered housing for military veterans.

| Mar 6, 2012

EwingCole completes first design-build project for the USMA

The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.

| Mar 6, 2012

Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago

Construction was completed by Skender in just 12 weeks.

| Mar 6, 2012

BLT Architects promotes two to associate

Architect Nicole Dress and interior designer Jessica Moser acknowledged for excellence.

| Mar 6, 2012

Joliet Junior College achieves LEED Gold

With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies with sustainable materials to meet aggressive energy efficiency goals.

| Mar 5, 2012

Tishman constructing new courthouse in Philadelphia

Construction is underway for the Pennsylvania Department of General Services’ 510,000-sf facility.

boombox1
boombox2
native1

More In Category

Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.



Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021