Structure Tone, a global construction services firm with annual revenues of over $3 billion, will pay a $55 million forfeiture after pleading guilty to felony charges. The lawsuit in the State Supreme Court, in Manhattan, alleged that the New York-based firm had its subcontractors, including electrical, drywall, and plumbing subs, inflate bills for the company's clients. The work in question included jobs for Bank of America, Moody's, Proskauer Rose, Bloomberg, and other customers from 2005 to 2009.
A report in the New York Times indicates that Structure Tone pled guilty to one count of falsifying business records in the first degree, a felony. David Szuchman, the chief of investigations for the district attorney, says Structure Tone became aware of the investigation in 2010 and put new safeguards in place; Szuchman's office continues to monitor the firm's business records and will do so for three years.
When functioning as a CM, Structure Tone asked subs to put unnecessary contingencies in an addendum called "Rider B," which was unknown to Structure Tone's clients. Execs also asked for discounts from subs on lump sum contracts, when the firm was working as a GC.
The company issued a statement as follows:
“The record-keeping issues, which form the basis of this agreement, date back to the period 2005 to 2009, and we have fully cooperated with authorities from the beginning. The financial position of our company — which generates $3 billion annually in revenue — continues to be strong. Long before this process began, we strengthened our compliance protocols to improve transparency.”
Related Stories
| May 14, 2012
Codes harvest rainwater
IAPMO’s Green Plumbing and Mechanical Code Supplement could make rainwater harvesting systems commonplace by clearly outlining safe installation and maintenance practices.
| May 14, 2012
Plumbing research coalition to study drainline transport issue
The effort is aimed at determining if decreasing levels of water flow––caused by increasingly efficient plumbing fixtures––are sufficient to clear debris from plumbing pipes.
| May 14, 2012
SOM to break ground on supertall structure in China
The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.
| May 14, 2012
Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons
Supertall two-tower complex located in Seoul’s Yongsan International Business District.
| May 14, 2012
SMPS and Deltek announce alliance
A/E/C industry leaders partner to advance technology’s role in design firm marketing and business development.
| May 14, 2012
ArchiCAD e-Specs integration unveiled
Architects, engineers and construction professionals use InterSpec’s e-SPECS products on thousands of projects annually to maintain synchronization between construction models, drawings, and project specifications.
| May 11, 2012
2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution
Download the complete White Paper, Chapters 1-10
| May 11, 2012
Chapter 10 Action Plan: 18 Recommendations for Advancing Sustainability in Reconstructed Buildings
We offer the following recommendations in the hope that they will help step up the pace of high-performance building reconstruction in the U.S. and Canada. We consulted many experts for advice, but these recommendations are solely the responsibility of the editors of Building Design+Construction. We welcome your comments. Please send them to Robert Cassidy, Editorial Director: rcassidy@sgcmail.com.
| May 11, 2012
Chapter 9 The Key to Commissioning That Works? It Never Stops
Why commissioning for existing and renovated buildings needs to be continuous to be effective.
| May 11, 2012
Chapter 8 High-Performance Reconstruction and Historic Preservation: Conflict and Opportunity
What historic preservationists and energy-performance advocates can learn from each other.